Laserfiche WebLink
<br />o <br /> <br />Part B - Hourly Prices <br /> <br />() <br /> <br />Eaulpment and Labor Rates <br />equipment Type Typical Hourly Hourly Total <br /> Clearing Equipment Labor Hourly <br /> Crew Rate Rate Rate <br /> Makeup <br />Bobcat Loader , suum <br />Bucket Truck 2 150.00 <br />ChipperlMulcher (S"throat) , 11 n- nn <br />ChlpperlMulcher (12" throat) , 11:;I:;M <br />Crew Foreman w/CeIl Phone and PickuD 1 I:;l:;nn <br />Dump Truck. 18 CY-20 CY 1 65.00 <br />Dump Truck, 21 CY.30 CY 1 filo.oO <br />Grader w/12' Blade 1 120.00 <br />Hvdrau6c Excavator. 1.5 CY 1 1:t0.00 <br />Hvdraulic Excavator 2.5 CY 1 150.00 <br />Knuckleboom Loader 2 lsn:nll <br />Laborer w/Chain Saw 1 I:;n nn <br />Laborer w/small tools, traffic control flsa cerson 1 ~6.nn <br />Lowbov Trailer wrrractor 1 l:ln.nn <br />Mobile Crane (Adeauate for hanaina IImbslleanina treesl , 1RI:; nn <br />Operations Manaoer w/CeIl Phone and Pickuo 1 6s.nn <br />Pickup Truck, 1/2 Ton 0 6.nn 6.00 <br />Traffic Control, Temporarv Sinale Lane Closure 1 ,1;. nn ~nn <br />Tree CUmber s1Chalnsaw 1 1 n'i_nn <br />Wheel Loader, 2.5 CY, 950 or similar 1 nn_nn <br />Wheel Loader, 3.5 - 4.0 CY, 966 or similar 1 l:tl:;.nn <br />Wheel Loader 4.5 CY 980 or similar 1 150.00 <br />Wheel Loader-Backhoe, 1.0 - 1.5 CY 1 71:; nn <br />Other - Please List <br />Dozer OS 1 120.00 <br />Flnnr .. ~ 1 14n.nn <br /> <br />Nolle: <br /> <br />NOlI I. Total Tllllll end Ue.rlal Prlceslhalllncluda all labor (operators, Iaborsll, and SupervllOrs), equlpmenland mal8rlaJa including bul nolllmlled <br />10: supplies, ~n1 maln1enanoe, lepalra, repair par1a, luela,lubrlelllll, cellular phones, lransponadon, IrIlftc conlrOland holllllnll, II ,*,ull'lCl, <br />_ry to ICCOmpllh tha praJllcl <br /> <br />Nola 2. Identify the EqulplllllnllPellOnnallhat conat1tut8 a TypIcal CIaarlng Craw In tIIa column provided <br /> <br />The Contractor will provide (number) of crews dedicated to perform the Work within the first 24 <br />hours following Notice to Proceed. <br /> <br />The Contractor will provlde _ (number) of crews dedicated to perform the Work within the first 48 <br />hours following Notice to Proceed. <br /> <br />45 <br /> <br />c <br /> <br />11lpage <br />