My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jimmy Crowder Excavating
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 08-07-01 Emergency Debris Clearing and Removal
>
Responses
>
Jimmy Crowder Excavating
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2011 4:38:40 PM
Creation date
3/23/2011 4:37:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Emergency Debris Clearing
Bid No. (xx-xx-xx)
08-07-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />o <br /> <br />c <br /> <br />7.11. SCHEDULE <br /> <br />7.11.1. Removal Operations: Must begin within 24 hours ct receiving the NoIice-to-Proceed and be functioning at 100% of <br />capacity within 2 days. Removal may begin ea~ier if adequate disposal sites are available and property <br />prepared. The City reserves the right to increase or decrease the scope of the removal activity as he/she deems <br />necessary to ensure effective management of the overall debris removaVdisposal operaoons. <br /> <br />7.11.2. Working Hours: Unless otherwise permitted by the City, working hours for removal ~erations shall be limned <br />to daylight hours. <br /> <br />7.12. EXTRA WORK <br /> <br />At the City's ~lion, the scope of work may be expanded to include Federal Aid System roadwyays, public paIks, other <br />recrealional areas, drainage structures, and channels. <br /> <br />7.13. UtfT PRICE PER CUBIC YARD OR TON BASIS OF MEASUREMENT AND PAYMENT <br /> <br />7.13.1. Debris removal will be paid for on the basis of a unn price per cubic yard or by the ton for all debris loaded, <br />hauled, and dumped at an apprcwed lancllill. The unn price per cuti: yard or ton must include all subsidiary costs, <br />including but not limned to labor, equipment, fuel, maintenance, general administration, and overhead and profit. <br />Compensation will be based solely on the volume of deOOs hauled as lb:umented by canple!ed load tickets <br />aani1islered and validated by City monitors. <br /> <br />7.13.2. The following conversion factors win be used to convert from cubic yards to tons unless material is weighed at <br />certified scales, in which case, the net weight of the materials shall prevail: <br /> <br />. Mixed Debris. Vegetation and Construction & Demolition = 500 LBSlCY or CY x 0.25 = Tons <br />. Yard Vegetation - SoftWood = 333.33 LBSICY orCY x 0.167 = Tons <br />. Yard Vegetation - Hard Wood = 500 LBS/CY or CY x 0.25 = Tons <br />. Construction & Demolnion = 1000 LBS/CY or CY x 0.5 = Tons <br />. Mulch = 1000 LBS/Cy or CY x 0.5 = Tons <br />. Regular Trash = 300 LBS/CY or CY x 0.15 = Tons <br />. Concrete = 2000 LBS/CY or CY x 1.0 = Tons <br />. Sand = 2600 LBSfCY or CY x 1.3 = Tons <br /> <br />42 <br /> <br />o <br /> <br />8lPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.