Laserfiche WebLink
<br />~ <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />f"\ <br /> <br />Part B - Hourty Prices <br /> <br />Equipment and Labor Rates <br />Equipment Type Typical Hourly Hourly Total <br /> Clearing Equipment Labor Hourly <br /> Crew Rate Rate Rate <br /> Makeup <br />Bobcat Loader s 88.00 <br />Bucket Truck 186.00 <br />Chiooer/Mulcher (S" throat) 60.00 <br />ChiooerlMulcher (12" throat) 75.00 <br />Crew Foreman w/CeIl Phone and Pickuo 82.00 <br />DumD Truck, 18 Cy.20 CY 72.00 <br />DumD Truck, 21 CY-30 CY 80.00 <br />Grader w/12' Blade 115.00 <br />Hvdraulic Excavator, 1.5 CY 125.00 <br />Hvdraulic Excavator. 2.5 CY 135.00 <br />Knuckleboom Loader 180.00 <br />Laborer w/Chain Saw 52.00 <br />Laborer w/small tools, traffic control, flag person 39.00 <br />Lowbov Trailer wfTractor 125.00 <br />Mobile Crane (Adeauate for hanging Iimbslleanina trees) up to 30 ton 195.00 <br />Operations Manaaer w/CeIl Phone and Pickup 98.00 <br />Pickup Truck, 1/2 Ton 18.00 <br />Traffic Control, TempOrary Sinale Lane Closure 150.00 <br />Tree Climber s/Chainsaw 62.00 <br />Wheel Loader, 2.5 Cy, 950 or similar 112.00 <br />Wheel Loader, 3.5 - 4.0 CY, 966 or similar 120.00 <br />Wheel Loader, 4.5 CY, 980 or similar 140.00 <br />Wheel Loader-Backhoe, 1.0 - 1.5 CY 125.00 <br />Other - Please Ust <br /> <br />Notes: <br /> <br />Noll 1. Total TlIIII IlId IIa1Irlal Prlcelwlllnckldlllllllbor (cperatOI'l, Iaboral'l, and lupervllol'l), equipment and materlalllncludlng but not IImI18d <br />to: luppll8l, equipment malnlllnance, rapall'l, repair partl, tuell, h.alcantl, cellular phone.. tranIportlllon, trafftc control and hoUlIng, " raqulnld, <br />IIlICIIUIY to lICCOIlIplilh the proJect. <br /> <br />NoIll2. Iden1Ify the Eq~mentlPel'lOnnel that collltltullla Typical Cllarlng Crew In the colllM provided <br /> <br />The Contractor will provide 4 (number) of crews dedicated to perform the Work within the first 24 <br />hours following Notice to Proceed. <br /> <br />The Contractor will provide 8 (number) of crews dedicated to perform the Work within the first 48 <br />hours following Notice to Proceed. <br /> <br />45 <br />