Laserfiche WebLink
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC Full Length <br /> <br />11/02 (05/06) <br /> <br />C. Use of Existing Building: Maintain existing building in a weathertight condition throughout <br />construction period. Repair damage caused by construction operations. Protect building and its <br />occupants during construction period. <br /> <br />1.10 OWNER'S OCCUPANCY REQUIREMENTS <br /> <br />A. Full Owner Occupancy: Owner will occupy site and existing building during entire <br />construction period. Cooperate with Owner during construction operations to minimize <br />conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day- <br />to-day operations. Maintain existing exits, unless otherwise indicated. <br /> <br />1. Maintain access to existing walkways, corridors, and other adjacent occupied or used <br />facilities. Do not close or obstruct walkways, corridors, or other occupied or used <br />facilities without written pennission from Owner and authorities having jurisdiction. <br />2. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's <br />operations. <br /> <br />B. Partial Owner Occupancy: Owner will occupy the premises during entire construction period, <br />with the exception of areas under construction. Cooperate with Owner during construction <br />operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to <br />interfere with Owner's operations. Maintain existing exits, unless otherwise indicated. <br /> <br />1. Maintain access to existing walkways, corridors, and other adjacent occupied or used <br />facilities. Do not close or obstruct walkways, corridors, or other occupied or used <br />facilities without written pennission from Owner and authorities having jurisdiction. <br />2. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's <br />operations. <br /> <br />C. Owner Occupancy of Completed Areas of Construction: Owner reserves the right to occupy <br />and to place and install equipment in completed areas of building, before Substantial <br />Completion, provided such occupancy does not interfere with completion of the Work. Such <br />placement of equipment and partial occupancy shall not constitute acceptance of the total Work. <br /> <br />1. Architect will prepare a Certificate of Substantial Completion for each specific portion of <br />the Work to be occupied before Owner occupancy. <br />2. Obtain a Certificate of Occupancy from authorities having jurisdiction before Owner <br />occupancy. <br />3. Before partial Owner occupancy, mechanical and electrical systems shall be fully <br />operational, and required tests and inspections shall be successfully completed. On <br />occupancy, Owner will operate and maintain mechanical and electrical systems serving <br />occupied portions of building. <br />4. On occupancy, Owner will assume responsibility for maintenance and custodial service <br />for occupied portions of building. <br /> <br />1.11 WORK RESTRICTIONS <br /> <br />A. On-Site Work Hours: Work shall be generally performed inside the existing building during <br />normal business working hours of <Insert time> a.m. to <Insert time> p.m., Monday through <br />Friday, except otherwise indicated. <br /> <br />SUMMARY <br /> <br />01100 - 4 <br />