My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />SECTION 01125 - SUMMARY OF MULTIPLE CONTRACTS <br /> <br />PART 1- GENERAL <br /> <br />1.1 RELATED DOCUMENTS <br /> <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 1 Specification Sections, apply to this Section. <br /> <br />1.2 SUMMARY <br /> <br />A. This Section includes a swnmary of each contract, including responsibilities for coordination <br />and temporary facilities and controls. <br /> <br />B. Specific requirements of each contract are also indicated in individual Specification Sections <br />and on Drawings. <br /> <br />C. Related Sections include the following: <br /> <br />1. Division 1 Section "Summary" for the Work covered by the Contract Documents, <br />restrictions on use of the premises, Owner-occupancy requirements, and work <br />restrictions. <br />2. Division 1 Section "Project Management and Coordination" for general coordination <br />requirements. <br />3. Division 1 Section "Temporary Facilities and Controls" for specific requirements for <br />temporary facilities and controls. <br /> <br />1.3 DEFINITIONS <br /> <br />A. Permanent Enclosure: As determined by Architect, permanent or temporary roofmg is <br />complete, insulated, and weathertight; exterior walls are insulated and weathertight; and all <br />openings are closed with permanent construction or substantial temporary closures. <br /> <br />1.4 COORDINATION <br /> <br />A. Project Coordinator shall be responsible for coordination between the General Construction <br />Contract and all contracts related to the Construction of the Scope of Work. <br /> <br />1. General Construction Contractor shall act as Project Coordinator. <br /> <br />1.5 PROJECT COORDINATOR <br /> <br />A. Project Coordinator: Full-time Project Coordinator shall be experienced in administration and <br />supervision of building construction, including mechanical and electrical work. <br /> <br />SUMMARY OF MULTIPLE CONTRACTS <br /> <br />01125 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.