My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6. QUALIFICATION OF BIDDERS <br /> <br />6.1 If requested, the Bidder shall submit to the Architect, prior to award of <br />contract, a properly completed Contractors Qualification Statement, along <br />with any other evidence of his satisfactory experience and ability to <br />perform the proposed Work. <br /> <br />6.2 If requested by the Owner, the Bidder shall submit a certified financial <br />statement, prepared within the past 30 days, indicating current financial <br />resources, liabilities, capital equipment, and past history performance. <br /> <br />6.3 Bidders may be disqualified and their bids rejected for any of the following <br />specific reasons: <br /> <br />a. Reason to believe that collusion exists among Bidders. <br />b. Determination of lack of competency as may be revealed by <br />qualification statements, financial statements, experience records, <br />or other questionnaires. <br />c. The Bidder's uncompleted work load which in the judgment of the <br />Owner, may cause detrimental impact on prompt completion of this <br />project. <br />d. The Bidder is involved in any litigation against the Owner. <br />e. The Bidder has defaulted on any previous contract or is in arrears <br />on any existing contract. <br />f. The submittal of more than one proposal from an individual, firm, <br />partnership, corporation or association under the same or different <br />names. <br />g. The Bidder, or its principals, have outstanding code enforcement <br />violations with the City of Sunny Isles Beach. <br /> <br />6.4 It shall be a requirement of this bid that there are no related party <br />transactions between the bidder and any employee, agent or contractor of <br />the City of Sunny Isles Beach. Any bidder who is a related party, as noted <br />herein, will be considered non-responsive and the proposal and bid bond <br />will be immediately returned. A bidder will be considered a related party if <br />the bidder has an ownership interest or is in any way related to an <br />employee, agent, consultant or contractor of the City, is a sub-consultant <br />of an employee, agent, consultant or contractor, and can influence the <br />management or operating policy of the other to an extent that one of the <br />transacting parties might be prevented from fully pursuing its own <br />separate interests. <br /> <br />7. PERFORMANCE OF WORK BY CONTRACTOR: <br /> <br />7.1 The Contractor shall perform on the site and with his own forces, work <br />equivalent to at least forty percent (40%) of the total amount of work to be <br />performed under this contract. After the contract is awarded, and during <br /> <br />Final Version 00100-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.