My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 00800 <br /> <br />FIRST AMENDED SUPPLEMENTARY CONDITIONS <br /> <br />The following supplements modify, change from or add to the Standard General Conditions of <br />the Construction Contract, EJCDC Document 1910-8, 1996 Edition. Where any Article of the <br />General Conditions is modified or any Paragraph, Subparagraph or Clause thereof is modified <br />or deleted by these supplements, the unaltered provisions shall remain in effect.- <br /> <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY hhmhm_h_um_mhh+':,;/ Formatted: Font: (Default) Arial, Bold, <br />. Underline <br />Add the following sentence to Paraqraph 1.Q1.,28 entitled "Notice of Award:: ,,{ Formatted: Centered <br /> <br />-"When requested by OWNER, the Notice of Award may be issued by the <br />ENGINEER." <br /> <br />... - u - - - { Formatted: Indent: Left: 0.5", Right: 0.5" <br /> <br />Add the following sentence to Paraqraph 1.Q1.,29 entitled "-Notice to Proceed:: <br /> <br />-"When requested by OWNER, the Notice to Proceed may be issued by <br />ENGINEER." <br /> <br />... - u u - { Formatted: Indent: Left: 0.5", Right: OS <br /> <br />Add the following terms after Paragraph 1.Q1.50: <br /> <br />1.51 ARCHITECT/ENGINEER - The person, firm or corporation named as the <br />ENGINEER in the Agreement. <br /> <br />... u h h { Formatted: Indent: Left: 0.5", Right: 0.5" <br /> <br />1.52 Provide - As used in the Project Manual, means to fumish and install, <br />complete and ready for intended use. <br /> <br />1.53 Product - As used in the Project Manual, includes materials, fabrications, <br />systems and equipment. <br /> <br />1.54 Project Manual - The volume of written construction documents, including <br />the Bidding Documents, sample forms, and the Contract Documents, such as the <br />Conditions of the Contract and the Specifications. <br /> <br />1.55 Retainaqe - The percentaqe of the Contract Price, retained by Owner from <br />the proqress payments to the Contractor for Work performed until the Work is <br />completed. It shall be payable to Contractor in accordance with the Contract <br />Documents. <br /> <br />ARTICLE 2 - PRELIMINARY MATTERS <br /> <br />+,,__--- Formatted: Font: (Default) Arial, Bold, <br />_uuu__ "" Underline <br /> <br />"'{ Formatted: Centered <br /> <br />Add the following to Paragraph 2.01~: <br /> <br />-"If the Work is to be commenced prior to execution of the Agreement in <br />response to a letter of intent, CONTRACTOR shall, prior to commencement of <br />the Work, submit evidence satisfactory to OWNER that such bonds will be <br />fumished." <br /> <br />... - u u - { Formatted: Indent: Left: 0.5", Right: OS <br /> <br />Final Version <br /> <br />00800-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.