My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2011-1691
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2011
>
Reso 2011-1691
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 4:27:24 PM
Creation date
4/5/2011 11:02:05 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2011-1691
Date (mm/dd/yyyy)
03/08/2011
Description
Agmt. w/Rep Svcs, Inc. for purchase of playground equipment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />Specifications/Scope of Work - continued <br />Bid on Bleachers, Park and Playground Equipment, No. II-OOI4-MR <br /> <br />SCOPE OF WORK- cont'd <br /> <br />Supplierlinstallation contractors shall not inhibit access to school centers during pursuit of work <br />specified herein. <br /> <br />Installation-contractor shall leave work site in a neat and orderly fashion at the end of each work <br />day. <br /> <br />The installation-contractor shall be responsible to ensure frequent pick-up of all rubbish, refuse, <br />scrap materials, and debris as a result of their operations so that work site presents a neat and <br />orderly appearance at all times. All rubbish, scrap, etc., shall be transported from the premises. <br />NO rubbish shall be deposited as fill on the work site. At completion of work, the contractor <br />shall remove all work materials, tools, construction equipment, machinery, and surplus materials <br />from the work site and shall leave project in ready to use condition. <br /> <br />Supplierlinstallation contractors or a representative, daily while on campus, shall sign in at the <br />school center's main office prior to commencing any work and shall sign out at school's office <br />prior to leaving campus. In addition, they must apprise themselves and abide by the rules and <br />regulations of that particular school site. <br /> <br />Installation-contractor shall be responsible for unpacking, uncrating and installation at job site in <br />accordance with specifications herein. <br /> <br />Installation-contractor shall ensure all work is installed straight, level, plum and in workmanlike <br />manner. <br /> <br />Installation-contractor shall verify and be responsible for the accuracy of all field measurements. <br /> <br />Installation-contractor shall be responsible for restoration of the site to its original condition to <br />include re-sodding of the area affected by their work with sod which is of the same variety and <br />quality as the surrounding sod. Where no sod exists prior to installation, the contractor shall <br />restore grade to a level consistent with the surrounding grade. <br /> <br />Supplier/installation contractors shall be responsible for the appearance of all working personnel <br />assigned to the project (clean and appropriately dressed at all times). <br /> <br />An English-speaking supervisor/representative must be on the work site at all times, who shall be <br />thoroughly knowledgeable of all plans, specifications and other contract documents and has the <br />authority to act in the installation-contractor's behalf. <br /> <br />Page 21 of37 <br /> <br />'" <br /> <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.