My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weekly Asphalt
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Responses
>
Weekly Asphalt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2011 5:17:15 PM
Creation date
4/5/2011 4:58:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />J <br /> <br />, <br />( <br /> <br />. <br /> <br />.& <br /> <br />4. L-17 There is not one line diagram for PNL-B it is not clear what is controlling <br />lighting contractors and Manual Disconnect is specified as 100A Circuit breaker <br />and Heavy duty Disconnect. Could we use any of these options for Disconnect? <br /> <br />Page L-17, a diagram for the panel will be provided in a plan revision. For <br />bidding purposes, the circuit breaker needs to be rated for 100 amps. <br /> <br />Question from ValleyCrest Landscapina Development: <br /> <br />1. RFI clarifying if item # 715-11-119 requires a concrete foundation, I would <br />appreciate it. The pay item note for this item at states "Includes the fi?cture, <br />luminaire, lamp, ground spike, mounting, foundation and any other material <br />necessary for a finalized installation." Although it states "foundation" there is no <br />detail of any foundation associated with this item. Typically foundation means <br />concrete, but I haven't seen any concrete detail. <br /> <br />The decorative light specs do not show a concrete foundation, and it is not <br />needed. Sheet LD-24 shows gravel to be placed around in-ground light fixture. <br />Install per manufacturer's instructions. <br /> <br />2. Is the company that is presenting a bid required to be verified on the State of <br />Florida website and to be listed as a Company General Contractor, or can <br />individual GC's bid on the project? <br />https://www.mvfloridalicense.com/wI11.asp?mode=1 &SID=&brd=&typ= <br /> <br />The company submitting the bid must be registered in the State of Florida as a <br />General Contractor. <br /> <br />Question from JAG Liahtina Solutions. Inc.: <br /> <br />1. Can you tell me what manufacturer of street light pOles and fixtures you are <br />using for this project? <br /> <br />Per sheet L-13 of the lighting plans, the pole manufacturer is Spring City <br />Electrical or approved equal. The fixtures are Lumec, model RN20. <br />
The URL can be used to link to this page
Your browser does not support the video tag.