My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weekly Asphalt
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Responses
>
Weekly Asphalt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2011 5:17:15 PM
Creation date
4/5/2011 4:58:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />, <br /> <br />o <br /> <br />BID FORM <br />for <br />SR AlA/Collins Avenue Streetscape Improvements <br />(from 187th Street to Wm Lehman Causeway) <br />Bid No. 08-10-01 <br /> <br />NOTE: The quantities shown in this bid form are estimates only! They may vary <br />significantly from the actual quantities. Payments will be made on the basis of actual <br />quantities placed and accepted by the City. The Bidder, by signing this Bid Form and <br />Contract, fully acknowledges that he/she will receive no additional compensation (no <br />overhead, no anticipated profits, etc.) other than the bid unit price of the items times <br />the number of items authorized, ordered, placed, and accepted by the City. SR <br />AlA/Collins Avenue is within a FDOT right-of-way, therefore, FDOT Pay Item numbers <br />are referenced herein. Contractor is to refer to the 2009 FDOT Basis of Estimates <br />Handbook for FDOT's standard method of documenting design quantities and <br />measurements. <br /> <br /> 7.6 Bid Form <br /> :,B.i.9'l,{';;'RE~;".' <br /> > Ite{' {FOOT PAY <br /> m<: ';, ITEM # <br />0 I. Summary of 0200 Roadway <br /> 1 Mobilization LS $ .5'l t:. 90. /)0 $ ~g, C, 9 (J. UU <br /> 101-1 <br /> J <br /> 2 102-1 Maintenance of Traffic LS $ 3 <I- 'No. UI) $ yf crY-D. u<> <br /> I , <br /> 3 Traffic Control Officer MH 120 $ 53. '-1-0 $ " "-o~. 00 <br /> 1 02-14 <br /> /. oa 300. 00 <br /> 4 102-60 Work Zone Signs ED 300 $ $ <br /> Barricade (Temporary) (Types I, II, VP & 3!> 710. DO <br /> 5 102-74-1 DRUM) ED 2,200 $ D. $ <br /> 50 f 10, DO <br /> 6 102-76 Panels Arrow Advance Warning ED 60 $ /3, $ <br /> High Intensity Flashing Lights (Temp - DO .;<y-o. 00 <br /> 7 102-77 Type B) ED 240 $ / . $ <br /> 8 Clearing & Grubbing LS 0.47 $ 9,.). '/1.00 $ 1.3 ,')L. <13 <br /> 110-1-1 <br /> 9 110-4 Removal of Existing Concrete SY 1,148 $ 7. 40 $ %, Lj9~. ;)C <br /> 17. 00 $ 1-, .).. 8' cf. ()() <br /> 10 120-1 Excavation Regular CY 252 $ <br /> $ q. 3<" $ :<. FL2. EX <br /> 11 120-6 Embankment CY 308 <br /> 12 Base Optional (Base Group 04) SY 1,757 $ 9 ~o $ I te, / ~ <1-. ,/-rJ <br /> 285-704 <br />. <br /> <br /> <br />PAGE 41 OF 130 <br />BID No. 08-10-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.