Laserfiche WebLink
<br />,..II <br /> <br />A.G.e. <br /> <br />AGC Consulting Civil Engineers & General Contractors, Inc. <br />10305 NW 41 st Street, Suite 115, Doral, Florida 33178 <br />Ph: 305.592.7283 Fax: 305.593.1594 <br /> <br /> <br />~\1E'i ~U""LlF!Q.., 1101 ~~ <br />Mr. Rufin brings over 18 years of experience in the Construction Supervision and <br />Inspections. In charge of the Construction Department of AGC. Responsible for <br />sampling, testing, and inspecting of construction materials placed during the <br />manufacturing process of the construction projects. In charge of plan permitting <br />and documentation of all construction operations for <br />com merci a 1/ resi dence/ roadway. <br /> <br />RElE\ft,;"Jr 'UP:::P.Ii::NCE <br /> <br />AGC Consulting Civil Engineers & General Contractors, Inc. <br />03/02 - Present: Project Manager - In charge of the supervision of all <br />construction activities for several commercial and residential projects. <br />Responsible for coordinating operations between all subcontractors including <br />shell contractor, plumbing, A/C and electrical contractors. <br /> <br />05/01 - 02/02: Inspector - Miami Intermodal Center (MIC). Responsible for <br />sampling, testing, and inspecting of construction materials placed in the project. <br />Responsible for documentation of all roadway operations, drainage work, <br />concrete construction, and asphalt placement. <br /> <br />ECONUD #4 - UNECA, Varadero. Cuba <br />09/90 -04/01: Project Engineer - Supervised and revised project's budget and <br />schedule. Responsible for the management control of progress, plans for <br />production of houses, buildings, high rises, road and bridges. Responsible for <br />supervision of survey and earthwork crews. Responsible for the production, <br />placement and inspection of asphaltic concrete at the plant and roadway. <br /> <br />President Superplaza <br />Client: Omar Rodriguez <br />Project Manager for the development of the Civil Site Construction Plans for this <br />new 82,000 Sq. Ft. Shopping Plaza center with more than 350 parking spaces, <br />located at 11300 Quailroost Drive, Miami, Florida. Construction Cost. <br />$5,200,000.00. In charge of Construction, Quality Control and Management of <br />all construction aspect of this site as well as the administration, coordination <br />and management of the company and subcontractors. Project include the <br />paving & drainage for the entire site approximately 8.2 Acres, 24 Drainage <br />Structures, 800 If of French Drains, and 21,200 SY of 8" Lime-rock Base & <br />Asphalt, filling the site with fill, 12-inch water main installation of approximately <br />1340 If, 2-inch water main installation of approximately 1850 If, 8-inch sewer <br />main installation of approximately 1500 If, 4-inch sewer main installation of <br />approximately 350 If, and 6-inch sewer main installation of approximately 60 If. <br />Completion Date: December, 2002. <br /> <br />Residence for Mr. Omar Rodriguez <br />Client: Omar Rodriguez <br />Project Manager for this new 10,800 Sq. Ft. Custom Home, located at 12267 <br />SW. 51st Street, Miami, Florida. <br />Construction Cost. $3,500,000.00. Completion Date: February, 2002. In charge <br />of construction, Quality Control and Management of all construction aspect of <br />this site. Responsible for the administration, coordination and management of <br />the company and subcontractors. <br />