My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Specifications
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 4:33:06 PM
Creation date
4/12/2011 4:32:38 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />material man, laborers, or Sub-Contractors employed pursuant to this Project. Each Bond shall be with a <br />Surety company meeting the qualifications of this document. Each Bond shall continue in effect for one <br />and one half years after final completion and acceptance of the Work with the liability equal to one <br />hundred percent (100%) of the Contract Sum. The Performance Bond shall be conditioned such that <br />Contractor will, upon notification by City, correct any defective or faulty Work or materials which appear <br />within one and one half years after final completion of the Contract. Pursuant to the requirements of <br />Section 255.05(1), Florida Statutes, Contractor shall ensure that the Bond(s) referenced above shall be <br />recorded in the public records of Miami-Dade County and provide City with evidence of such recording. <br /> <br />5.4.1. Each Bond must be executed by a surety company authorized to do business in the State of <br />Florida as a surety, having a resident agent in the State of Florida and having been in business <br />with a record of successful continuous operation for at least five (5) years. <br /> <br />5.4.2. The surety company shall hold a current certificate of authority as acceptable surety on federal <br />bonds in accordance with the United States Department of Treasury Circular 570, current <br />Revisions. <br /> <br />5.4.3. The City will accept a surety bond from a company with a rating B+ or better. <br /> <br />5.4.4. Failure of the successful Bidder to execute and deliver the Agreement and deliver the required <br />bonds and Insurance Certificates as stipulated in paragraph 5.3 shall be cause for the City to <br />annul the Notice of Award and declare the Bid and any security therefore forfeited. <br /> <br />5.5. Contractor's Pre-Start Representation: Contractor represents that they have familiarized <br />themselves with, and assumes full responsibility for having familiarized themselves with the nature and <br />extent of the Contract Documents, Work, locality, and with all local conditions and federal, State and local <br />laws, ordinances, rules and regulations that may in any manner affect performance of the Work, and <br />represents that they have correlated their study and observations with the requirements of the Contract <br />Documents. Contractor also represents that they have studied all surveys and investigations reports of <br />subsurface and latent physical conditions referred to in the specifications and made such additional <br />surveys and investigations as they deem necessary for the performance of the Work in the Contract <br />Documents and that they have correlated the results of all such data with the requirements of the <br />Contract Documents. <br /> <br />5.6. Commencement of Contract Time: The Contract Time will commence to run on the date <br />stated in the Notice to Proceed. <br /> <br />5.7. Starting the Project: Contractor shall start to perform their obligations under the Contract <br />Documents on the date when the Contract Time commences to run. No Work shall be done at the site <br />prior to the date on which the Contract Time commences to run, except with the written consent of the <br />City. <br /> <br />5.8. Before Starting Construction Before undertaking each part of the Work, Contractor shall <br />carefully study and compare the Contract Documents and check and verify pertinent figures shown <br />thereon and all applicable field measurements. They shall at once report in writing to Consultant any <br />conflict, error, or discrepancy which they may discover; however, they shall not be liable to City for their <br />failure to discover any conflict, error, or discrepancy in the Drawings or Specifications. <br /> <br />5.9. Pre-Construction Conference: Within five (5) days after delivery of the executed Agreement <br />by City to Contractor, but before starting the Work at the site, a Pre-Construction conference will be held <br />to review the above schedules, and for processing Statement of Services, and to establish a working <br />understanding between the parties as to the Project. Present at the conference will be the City <br />representative, the Consultant and the Contractor. <br /> <br />PAGE 14 OF 130 <br />BID No. 08-10-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.