My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Specifications
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 4:33:06 PM
Creation date
4/12/2011 4:32:38 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 24 <br />SPECIAL COORDINATION <br /> <br />The City, while not directing the methods or means by which the Contractor performs the Work, does <br />require the Contractor to perform certain work first that is tied to a time sensitive grant provided by <br />Miami-Dade County for landscape work within FDOT's right-of-way. <br /> <br />More specifically: <br /> <br />The Contractor is to complete the planting, irrigation and landscape lighting work behind the retention <br />areas on the north and south sides of l89th Street from l87th Street to Wm Lehman Causeway, the <br />planting, irrigation and paver sidewalk work on the east side of SR AlA/Collins Avenue adjacent to the <br />Wm Lehman Causeway ramp (east and west sides) and the planting and irrigation work at the <br />intersection of SR AlA/Collins Avenue and Sunny Isles Boulevard prior to any other work. <br /> <br />END OF SEUION <br /> <br />PAGE 86 OF 130 <br />BID No. 08-10-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.