Laserfiche WebLink
<br />SECTION 24 <br />SPECIAL COORDINATION <br /> <br />The City, while not directing the methods or means by which the Contractor performs the Work, does <br />require the Contractor to perform certain work first that is tied to a time sensitive grant provided by <br />Miami-Dade County for landscape work within FDOT's right-of-way. <br /> <br />More specifically: <br /> <br />The Contractor is to complete the planting, irrigation and landscape lighting work behind the retention <br />areas on the north and south sides of l89th Street from l87th Street to Wm Lehman Causeway, the <br />planting, irrigation and paver sidewalk work on the east side of SR AlA/Collins Avenue adjacent to the <br />Wm Lehman Causeway ramp (east and west sides) and the planting and irrigation work at the <br />intersection of SR AlA/Collins Avenue and Sunny Isles Boulevard prior to any other work. <br /> <br />END OF SEUION <br /> <br />PAGE 86 OF 130 <br />BID No. 08-10-01 <br />