My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Specifications
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 4:33:06 PM
Creation date
4/12/2011 4:32:38 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 30 <br />TRENCH SAFETY DESIGN <br /> <br />Part 1 - GENERAL <br /> <br />30.1 Section Includes: All geotechnical, structural or other design considerations necessary for <br />trench safety design. <br /> <br />30.2 References: Department of Labor criteria and OSHA Safety and Health Standards (29 CFR <br />1926/1010), and the State of Florida trench safety criteria. <br /> <br />30.3 System Description: Design requirements. Designer shall have sufficient professional <br />engineering competence to designate necessary geotechnical investigation, interpret geotechnical <br />information, and formulate structural design. Performance Requirements. Provide for safety of <br />all personnel and the public present in or adjacent to any trench constructed under the scope of <br />this contract. <br /> <br />30.4 Quality Insurance: Qualification. Designer to have completed a minimum of 20 trench safety <br />designs in the last two (2) years and have had no trench safety design failures. Regulatory <br />Requirements. Conform to any local, State, and Federal laws, rules, regulations, and ordinances <br />covering design and trench safety designs. <br /> <br />30.5 REVIEW PERIOD: The Consultant shall review submittals and respond to them within 10 <br />working days of their receipt. <br /> <br />Part 2 - PRODUCTS <br /> <br />Not included in this section <br /> <br />Part 3 - EXECUTION <br /> <br />30.6 field Quality Control: Inspect the Work with sufficient regularity to assure compliance with <br />trench safety design. <br /> <br />END OF SECTION <br /> <br />PAGE 93 OF 130 <br />BID No. 08-10-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.