Laserfiche WebLink
<br />... <br />. ,J <br />_.#r <br /> <br />~ <br />_l . <br /> <br />. <br /> <br />~~ ~!!~B!~a!:' <br /> <br />BASE PARK OPTION <br /> <br />Haskell will approach the base park option assuming the Park portion will be the fence <br />around the perimeter, an irrigation system and sod covering the entire open area. We <br />are not including the driveway in this option because the driveway will not change <br />regardless of which Park option is chosen. The cost of the driveway remains in Phase 1 <br />- Parking Garage pricing. <br /> <br />The sod included is the specified Sea Dwarf Seashore. The fence has been revised to <br />include two (2) gates each at 8 feet. The irrigation design has been revised based on <br />the new landscaping approach. <br /> <br />Base Park Option I <br /> I <br />General Conditions 1 LS $ - $ 50,000 <br />Asphalt Pavina 1 LS $ - $ - <br />6" Concrete Curb 1 LS $ - $ - <br />Sod only at Park - SeaDwarf Seashore <br />Sod 1 LS $ 43,700,00 $ 43,700 <br />Irriaation for Base Park 1 LS $ 15,000,00 $ 15,000 <br />Aluminum 6' Picket Fence Welded 920 LF $ 45,00 $ 41 ,400 <br />Aluminum Gate Pair (2) x 4'-0" = 8'-0" 2 EA $ 875,00 $ 1,750 <br />Aluminum Gate Pair (2) x 5'-0" = 10'-0" 2 EA $ 875.00 $ 1,750 <br /> $ <br />Dailv Cleanup Crew -2 WK $ 500,00 (1,000) <br /> $ <br />Dumpsters -1 EA $ 350.00 (350) <br /> SUB TOTAL $ 152,250 <br /> <br />FEE $ 5,000 <br />SUBTOTAL $ 157,250 <br />PERMIT FEE $ <br />BUILDERS RISK <br />ALLOWANCE $ 1,600 <br />LIABILITY <br />INSURANCE $ 1,200 <br />P & P BOND $ 600 <br />GRAND TOTAL I $ 160.650 I <br />