Laserfiche WebLink
<br />" <br /> <br />, <br /> <br />~ <br /> <br />Request for Information 009 <br /> <br />~ <br /> <br />Heritage Park & Parking Garage <br />A 1 A & 192nd Street <br />Sunny Isles Beach, FL. 33160 <br /> <br />Project # 60040764 <br />Tel: 305-792-1928 <br /> <br />RFI #: 009 Date Created: 5/13/2009 <br /> <br />1A!!!Yt.~G..OJ!lP.ll!!Y. <br /> <br />City of Sunny Isles <br />Engineering & Public Works Director <br />18070 Collins Avenue <br />Sunny Isles Beach, FI33160 <br /> <br />Arl~w.eJ:.Et~L~y. <br />Mr. Rick Conner <br /> <br />I [Author Comp'any' Authored By' <br /> <br />Pavarini South East John Lunsford <br />2400 E Commercial Blvd., Suite 900 <br />Fort Lauderdale, FL 33308 <br /> <br />Co.Respon(tent <br /> <br />I i\Uthor RFfN'Urill)er <br /> <br />~ject <br />Clarification <br /> <br />Discip.line <br />Plumbing <br /> <br />Categ2.,."Y. <br />Stormwater System <br /> <br />Cc: ComRaoyJ!ame <br /> <br />Contact Name <br /> <br />CQ.pl~s_~ot~..!i <br /> <br />Question <br /> <br />Date Reguired: 5/18/200'9 <br /> <br />Plumbing Drawings, specifically P2.2.01 indicates a separated storm water system. We see two lines discharge lines <br />coming out of the building, but can't trace lines to separate storm water system pipes on the Civil plans. Please Clarify. <br /> <br />~.!!ggestion . <br /> <br />Date I\nsweredi <br /> <br />~nswer <br /> <br />The two rainwater leader systems (one for the ground and intermediate floor <br />and one for the top floor) are routed to catch basin no. 10. After the lines <br />enter the catch basin they do not need to be separated. <br /> <br />5-18-09 <br /> <br />Prolog Manager <br /> <br />Construction <br />