Laserfiche WebLink
<br />It PAVARINIII <br /> <br />~. CONSTRUCTION COM PAN Y <br /> <br />Request for Information 017 <br /> <br />~ <br /> <br />Heritage Park & Parking Garage <br />A 1 A & 192"0 Street <br />Sunny Isles Beach, FL. 33160 <br /> <br />Project # 60040764 <br />Tel: 305-792-1928 <br /> <br />.:~;;jri_lilr <br /> <br />\Answer ComRagy, <br /> <br />City of Sunny Isles <br />Engineering & Public Works Director <br />18070 Collins Avenue <br />Sunny Isles Beach, FI33160 <br /> <br /> <br />IF.I r:1l1tT:F.i r:ro -'1' I:JI'..{I!II:1 <br /> <br />Authored By' <br /> <br />Co-ResRQi1dent <br /> <br />I If'uthor RFrNum6er <br /> <br />~ <br /> <br />Su6lect <br />Base Park Bid Clarification <br /> <br />DisciQline <br />Administration <br /> <br />Category <br />Allocations <br /> <br />1 <br /> <br />Cc: ~P..MY.Jia.!!te <br /> <br />Contact ~ame <br /> <br />c;.OPles Note~s <br /> <br />Question <br /> <br />Date Reguired: 5/20/2009 <br /> <br />Are we assume Bid Item No 1: to include the Landscaping and accessories around three sides of the garage and <br />five feet to the North Side of the Garage. Bid Item #2: to include Landscaping and accessories from the West side <br />fence to the new fence on the West side of the open area. Bid Item #3: are all of Remaining Areas to be <br />considered the Park Area. The Next Bid Item would be a total of all three above. If this is confirmed, then are we <br />assume the Base Park Option will be all area we assumed in Bid Item #3 , and this we assume will be diminished <br />to basic sod, irrigation and possibly a chain link fence to reduce costs. Are we to also assume the paver area <br />outside the fence on the corner of 193rd and Collins to be reduced to bare minimum? Please specify where to <br />place costs of landscaped areas adjacent to and integral to main structures and where boundaries are to stop. <br />Where do we stop sidewalks? Will required sidewalks be colored or grey? <br /> <br />L..Answer <br /> <br />Qate Answerea: <br /> <br />See Attached phasing diagram. <br /> <br />5-19-09 <br /> <br />Prolog Manager <br /> <br />Construction <br />