My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 9:59:17 AM
Creation date
4/22/2011 2:51:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />requiring clarification or interpretation and why the response is needed. The RFI must set forth <br />the Contractor's interpretation or understanding of the document(s) in question, along with <br />the reason for such understanding. <br /> <br />Schedule of Values means a written schedule setting forth the detailed and itemized cost <br />breakdown, inclusive of labor, material, and taxes of all elements comprising the Work. <br /> <br />Specifications and Plans as used herein means that portion of the Contract Documents <br />which are the written requirements for the materials, equipment, systems, standards and <br />workmanship for completion of the Work and performance of related services, as prepared by <br />Spillis-Candela DMJM for this Project. <br /> <br />Sub-Contractor(s) means a person or entity other than a materialman or laborer that has a <br />direct contract with the Contractor to perform or supply any portion of the Work. <br /> <br />Substantial Completion means that point at which the Work is at a level of completion in <br />substantial compliance with the Agreement such that the City can use, occupy and/or operate <br />the facility in all respects to its intended purpose. Substantial Completion shall be evidenced by <br />the City's execution of a Certificate of Substantial Completion. <br />Time for Completion means the date of Substantial Completion as specified in the Contract <br />Documents. <br /> <br />Work as used herein refers to all services required by the Contract Documents, including all <br />labor, materials, equipment, supervision and services needed to complete the Project in <br />accordance with the Contract Documents. <br /> <br />ARTICLE 1. SCOPE OF WORK <br /> <br />Contractor shall provide all labor, materials, equipment, tools, manpower, management, <br />supervision, and all other necessary goods and services to perform the Work in the manner <br />provided this Agreement and the Contract Documents. <br /> <br />ARTICLE 2, CONTRACT TIME. TIME FOR COMPLETION AND LIQUIDATED <br />DAMAGES <br /> <br />2,1 Time is of the essence in the performance of the Work under this Agreement. The <br />Commencement Date shall be no later than five (5) days after City's issuance of the Notice to <br />Proceed. Contractor shall perform the Work in accordance with the Construction Schedule and <br />shall achieve Substantial Completion of construction not later than the Time for Completion. <br />2,2 Contractor shall complete all applications for the Permits within ten (10) calendar <br />days after execution of this Agreement. A Notice to Proceed for the commencement of the Work <br />will not be issued until Contractor's submission to the City of all required documents, including, <br />but not limited to, the Bonds, the Insurance Certificate and the Permits. In the event Contractor <br />fails to deliver to the City the required documents within ten (10) days after the Execution Date, <br />or fails to apply for the Permits within ten (10) days after the Execution Date, or fails to <br />commence the Work within five (5) days after the City's Issuance of a Notice to Proceed, then <br />Contractor shall be in default. In such event the City, in addition to all remedies provided for an <br />event of Contractor's default hereunder, shall have the right to collect from Contractor all <br />expenses incurred by the City in the re-procurement of the Services. <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.