My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 9:59:17 AM
Creation date
4/22/2011 2:51:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />earned thereafter. Any reduction in retain age shall be in accordance with Section 255.078 Florida <br />Statutes. Any interest earned on retainage shall accrue to the benefit of the City. All requests for <br />retainage reduction shall be in writing in a separate stand alone document. <br /> <br />5,4 The City may withhold, in whole or in part, payment to such extent as may be necessary to <br />protect itself from loss on account of: <br /> <br />5,4,1 Defective Construction Work not remedied. <br />5,4,2 Claims filed or reasonable evidence indicating probable filing of <br />claims by other parties against Contractor or the City because of <br />Contractor's performance. <br /> <br />5,4,3 Failure of Contractor to make payments properly to Sub-Contractors or <br />for material or labor. <br /> <br />5.4,4 Liquidated damages and costs incurred by the City for extended construction <br />administration. <br /> <br />5,4,5 Failure of Contractor to comply with other provisions of this Agreement. <br /> <br />5,5 Upon receipt of written notice from Contractor that the Work is ready for final <br />inspection and acceptance, the City or its designee shall, within ten (10) calendar days, make <br />an inspection thereof. If the City or its designee finds the Work acceptable, the requisite <br />documents have been submitted and the requirements of the Contract Documents fully satisfied, <br />and all conditions of the permits and regulatory agencies have been met, a Final Certificate for <br />Payment shall be issued by the City or its designee, stating that the requirements of the <br />Contract Documents have been performed and the Work is ready for acceptance under the <br />terms and conditions thereof. <br /> <br />5,6 Before issuance of the Final Certificate for Payment, Contractor shall deliver to the <br />City or its designee a complete release of all liens arising out of this Agreement, or receipts in <br />full in lieu thereof, an affidavit certifying that all suppliers and Sub-Contractors have been paid <br />in full and that all other indebtedness connected with the Construction Work has been paid, and a <br />consent of the surety to final payment; the final corrected As-Built Drawings; the Record <br />Set; and the final bill of materials, if required, and Application for Payment. Contractor <br />shall deliver the written Contractor's and all Manufacturers warranties prior to issuance of <br />the Final Certificate for Payment. <br /> <br />5,7 If, after the Construction Work has been substantially completed, full completion <br />thereof is materially delayed through no fault of Contractor, and the City or its designee so <br />certifies, the City shall, upon certificate of its designee, and without terminating the <br />Agreement, make payment of the balance due for that portion of the Construction Work fully <br />completed and accepted. Such payment shall be made under the terms and conditions <br />governing final payment, except that it shall not constitute a waiver of claims. <br /> <br />5,8 Final payment shall be made only after the City or designee has reviewed a written <br />evaluation of the performance of Contractor prepared by the City or its designee, and approved <br />the final payment. The acceptance of final payment shall constitute a waiver of all claims by <br /> <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.