My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 9:59:17 AM
Creation date
4/22/2011 2:51:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARTICLE 9, SCOPE OF WORK MODIFICATION PROCEDURES <br /> <br />9,1 OWNER INITIATED MODIFICATIONS <br /> <br />The City or its designee will issue a detailed description of proposed changes in the Work that <br />may require an adjustment(s) to the Contract Amount or Contract Time. If necessary, the <br />description will include supplemental or revised drawings and specifications. Subsequent to <br />notification of modifications in the Work by City or its designee, Contractor shall submit a <br />quotation estimating cost adjustments to the Contract Amount and/or the Contract Time <br />necessary to execute the change. Contractor shall include the following information when <br />responding: <br /> <br />. Include a list of quantities of products required or eliminated and unit costs, with total <br />amount of purchases and credits to be made. If requested, furnish survey data to <br />substantiate quantities. <br />. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br />discounts. <br />. Include costs of labor and supervision directly attributable to the change. <br />. Include an updated contractor's construction schedule that indicates the effect of the <br />change, including but not limited to, changes in activity duration, start and finish times, <br />and activity relationship. Use available total float, if any, before requesting an extension <br />of the Contract Time. <br /> <br />9,2 CONTRACTOR INITIATED MODIFICATIONS <br /> <br />If latent or unforeseen conditions require modifications in the contract, the Contractor may <br />propose changes by submitting a request for a change to the City or its designee. Contractor <br />shall use form AlA Document G709 for said modification requests. The following MUST be <br />submitted/included by Contractor: <br /> <br />. A statement outlining reasons for the change and the effect of the change on the Work. <br />Provide a complete description of the proposed change. Indicate the effect of the <br />proposed change on the Contract Amount and the Contract Time. <br />. A list of quantities of products required or eliminated and unit costs, with total amount of <br />purchases and credits to be made. If requested, furnish survey data to substantiate <br />quantities. <br />. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br />discounts. <br />. Cost of lqbor and supervision directly attributable to the change. <br />. Updated contractor's Construction Schedule that indicates the effect of the change, <br />including, but not limited to, changes in activity duration, start to finish times, and <br />activity relationship. Use available total float before requesting an extension of the <br />Contract Time. <br />. Comply with any applicable product requirements if the proposed change requires <br />substitution of one product or system for product or system specified. <br /> <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.