|
<br />Thornton Construction
<br />
<br />7) Description of recent project experience, including projects of similar size, and client references with contact information.
<br />below please find projects that are similar in size and scope along with client references.
<br />
<br /> CONTRACf OFFICER CONTRACf
<br />NAME OF PROJECf /LOCATION DESCRIPTION OWNER ADDRESS AMOUNT
<br /> TELEPHONE
<br />739-F D-EXlENSIONINfERlOR Thornton ConstnJCt.ion is one of the few qualified contractors capable of working at WA Fernando Uriste
<br />American Airlines/Turner PO BOX 70CfJ
<br />FINISH Thornton's ponion of this work consisted of new suuctural v.'OrK. inside concourse D and building Austin Miami, Florida $ 2,992,575.00
<br />Miami IntematioIU! AiIpon, Florida bathrooms and Storages on the ramp level to name a few. 305.869.5983
<br /> Thornton ConstrUCtion W,J.S selected as the G:mstruetion Management finn to function as a General
<br />MISCELLANEOUS CONS1RUcnOI' Contr.lctor responsible for bidding trade COntr.lctS, all scheduling and coordination of project and the Ana Pedrosa
<br />MANAGEMENf CONIRACf soccessful, timely, and economic completion of the project. As the CM firm, Thornton provided Jackson Memorial Hospital 1611 NW 12 Ave $ 10,OCfJ,OCfJ.00
<br />Miami, Florida preconsuu.:tion and construetion services to Jackson Memorial Hospital Miami, Florida 33136
<br />Under this cornract, Thornton v.u10US construetion services, including medical renovations, 305 585 1302
<br /> remolding. restonUon and additions at various sites on the Jackson Memorial Hospital campus.
<br /> The S. Dade Government Center provides space for several public oriented. government setvices Steve Habol' Proja:t Manager
<br />SOUIHDADE GOVERNMENf inch.Jing the Courthouse. The South Dade Government Center Complex emplol' 140 and provides General Services Miami Dade County ,GSA
<br />CENfER daily services to over 2,100 customers. Thornton Consuuction renovated approximately 10.300 sq. ft. Administration! Board of III NW 1ST. ST. SlTIE 12th Floor $ 1,280,0CfJ.00
<br />Miami, Florida f the 1st & 2nd floor of the existing Government Center, adding counrooms, cIwnbets and post QnUlty Cormnissioners MIAMI, FL 33128-1914
<br /> judgment area.
<br />NORlH TERMINAL This project is approximate 5,000 sft interior build out space for the American Airlines maintenance Rober Locak, POjV (PM)
<br />DEVELOPMENf PROGRAM MIA NW nnd Street & Perimeter Rd.
<br />747 G-A-B Infill Tenant Relocation crew. The project incIooes a new mechanical sl'tem and all electrical infrasuu:ture required to run Parsons Odebrech,]. V. Building 3025 Miami, F133159 $ 1,725.511.00
<br />Miami IntemnioIU! AiIpon, Florida their maintenance operations. 305-869-4200
<br /> Completion of the building shell package of a Five story concour.;e building at Miami IntematioIU!
<br /> AiIpon; inclOOiog all structural, roofing. mechanical, plumbing and electrical componentS. This
<br /> project also incIooes the completion of the finishes for the connecting conidor betW<en the D-
<br /> Terminal and the existing terminal.
<br />NORlH TERMINAL In addition, completed the maintenance facility for the passenger mover that will run along the tOp Jim Stor<y
<br />DEVELOPMENf PROGRAM 737G, NW 22nd Street & Perimeter Rd.
<br />739H floor of new NOM Terminal. This facility cons~ted of over 20.0CfJ sqw.re feet of office, storage and Parsons Odebrech, ].V. Building 3025 Miami, Fl33159 $ 16,0CfJ,0CfJ.00
<br />Miami Intel1LltioIU! AiIpon, Florida maintenance space that will allow Swnitomo Corporation to host their equipment and train (people (305) 869,4200
<br />mover) controls.
<br /> Finally, completed the main mechanical, e!ecuical, fire sprinkler, plumbing and building componentS
<br /> of the new CD Infill shell building that allowed the finish COntr.lctor.; to proceed with their interior
<br /> insulbtions
<br /> In posto9/ 11 America. security is a matter of great concern and sensitivity at or near airpons. The
<br /> controlled pollion of the airpon ",her< people have direct access to ain:raft ~ called the AiIpon
<br /> Operation Area (AOA). The AOA encompasses all areas inside airpon fencing designated and used
<br /> for Lmding, taking off, or swface maneuvering of aircraft, inclOOiog ramps, aprons, runwal' and
<br /> taXiw:tl'.
<br /> As part of the AOA Perimeter Fence and Access Road project, TCCl's wo.x straddled the bound.uy
<br /> between the "landside" ponion of the AOA and all other AOAareas of Concour.;e A, cunentlyunde
<br /> constrnetion TCa cre.ued the AOA separation for Terminal A in order to allow this area to become
<br />AOA PERIMETER FENCE B779-F landsi<k. As a result, consuu:tion personnel can now pertorm dailyconsuu:cion activities without Wibey Zr<ibi
<br />Miami IntematioIU! AiIpon, Florida having to pass through the security process at the NOM Terminal Development Gate. Parsons Odebrech,]. V. gaibey.zreibi@pojvOntd.com $ 1,298,653.00
<br />The project proceeded in three phases: the AOA separation at the apron and all building levels; the
<br /> construction of a new road to access the landside area; and the parking stripping. signage and control
<br /> point. TCCl was required to follow strict protocols for maintaining the imegrityof the secumi AOA,
<br /> even as consuu:cion took puce.
<br /> Concour.;e A was closed to allow 70% of wo.x to proceed landside, rather than in the
<br /> ain:raft.operating area, avoiding the need for increased security clearances. Jolm W.
<br /> Cosper, fonner Deputy Director of Capital Improvements for MOAD, said this would
<br /> shave up to S200 million overall and speed up wo.x by twO )";tIS!
<br /> Project cons~t on the supply and installation of Hollow metal and suinIess steel door.;, fr.unes and Dean Or",
<br />BCX:DOORS 739C, 7391, 740A hardware at the CD and B-Clnfill projects at the NOM Terminal. Additionally, we willsupplyand Beuclump Construction 2100 Ponce de Leon Blvd., Suite 825 $ 1,571,844.00
<br /> insull architectur.U and specialty doors that are non automatic. Company, Inc. Coral Gables, FL 33134
<br /> 305-445,0819
<br /> Enrique Juarez
<br />V ASaJLAR ANGIOGRAPHY Jones Lang LaSalle
<br />SUlTES@ JMH Interior renov.ltion to house new imaging equipment with 4 le-ad lined imaging rooms Jackson Memorial Hosptial 1611 NW 12th Ave. S 1,749,316.00
<br />Miami, Florida Miami, Florida
<br /> (305) 585-7834
<br /> The purpose of the Florida Department of Juvenile Justice's lCARE boarding school ~ to r<habilitate
<br /> the lives of 36 troubled bol'. It ~ part of the pilot Bay Point Schools program established in 1995 fo Ken Most}tt
<br /> 13, to 18'l"M'old juvenile delinquents, based on a tbeorythat these bol' are not mentally ill, sick or
<br />lCARE BA YPOINf SOiOOL born bad. In place of treaunent, education, behavior mxlification and moral development are Department of Juvenile 2737 Centerview Dr. # 114 S 2,536,229.00
<br />Miami, Florida emphasized in an innov.ltive approach. The project consisted of new consuur..-uon of a twQ--Story, Justice TalLthassee, Florida 33606
<br /> 24,500 square-foot classroom building with approximately II classrooms LUgeted to acconunodate 813,251,0565
<br /> 225 stooents,
<br />NIDC. Project 779J & 779F.I- Access Construct new roadway to access the lands ide area and the parking strip, signage and control points. Maria Rios
<br />Rd & Ltndside Projects Parsons Odebrech, J.V. $ 1,436,919.00
<br />Miami Intel1LltioIU! AiIpon, Florida Additionally, Thornton build new parking lot with new barricades & striping 305-869-5656
<br />
|