<br />Thornton Construction
<br />
<br />7) Description of recent project experience, including projects of similar size, and client references with contact infonnation.
<br />below please find projects that are similar in size and scope along with client references.
<br />
<br /> CONTRACT OFFICER CONTRACT
<br />NAME OF PROJECT/LOCATION DESCRIPTION OWNER ADDRESS AMOUNT
<br /> TELEPHONE
<br />739.F D.EXIENSIONINTERIOR Thornton Construction is one of the few qualified contractors capable of working at :MIA Fernando Uriste
<br />American Airlines/Twner PO BOX 7000
<br />FINISH Thormon's portion of this work consisted of new structural work inside concourse D and building Austin Miami, Florida $ 2,992,575.00
<br />Miami International Allpon, Florida bathroolIl'i and storages on the ramp level to name a few. 305.869.5983
<br /> Thornton Construction was selected as the Construction Management firm to function as a General
<br />MISCELLANEOUS CONSTRUCIlOr- Contr.lctor responsible for bidding trade COntr.lcts, all scheduling and coordination of project and the Ana Pedrosa
<br />MANAGEMENT CDNTRAcr successful, timely, and economic completion of the project. As the CM firm, Thormon provided Jackson Memorial Hospital 1611 NW 12 Ave $ 10,000,000.00
<br />Miami, Florida preconstruction and construction services to Jackson Memorial Hospital. Miami, Florida 33136
<br />Under this contract, Thornton various construction services, .including medical renovations, 305 585 1302
<br /> remolding, restoration and additions at various sites on the Jackson Memorial Hospital campus.
<br /> The S. Dade Government Center provides space for several public oriented government services Steve Habor. Projec~ Manager
<br />SOU1HDADE GOVERNMENT including the Counhouse. The South Dade Government Center Complex emplol' 140 and provides General Services Miami Dade County -GSA
<br />CENTER daily services to over 2,100 customers. Thornton Construct.ion renovated approximately 10,300 sq. ft. Administration! Board of III NW 1ST. ST. SUIT 12th Floor $ 1,280,000.00
<br />Miami, Florida f the 1st & 2nd floor of the existing Government Center, adding counrooms, cbambe" and post ColUlty Commissioners MIAMI, FL 33128-1914
<br /> judgment area.
<br />NORm IERMINAL This project is approximate 5,000 sft interior build out space for the American Airlines maintenance Roher Lucak, POJV (PM)
<br />DEVELOPMENT PROGRAM MIA NW 22nd Street & Perimeter Rd.
<br />747 G-A.B Infill Tenant Relocation crew. 1he project includes a new mechanical system and all elecuical infrasuucrure required to run Parsons Odebrech, J. V. Building 3025 Miami, Fl33159 $ 1,725,511.00
<br />Miami International Airpon, Florida their maintenance operations. 305.869.4200
<br /> Completion of the building shell package of a Five stOlyconcourse building at Miami International
<br /> Airpon; including all structural, roofing, mechanical, plumbing and electri<:al components. This
<br /> project also includes the completion of the finishes for the connecting cotridor betWeen the D-
<br /> Tenninal and the existing terminal
<br />NORm IERMINAL In addition, completed the maintenance facility for the passenger mover that will run along the top Jim Storey
<br />DEVELOPMENT PROGRA,\1737G, NW 22nd Street & Perimeter Rd.
<br />739H floor of new North TenninaI. This facility consisted of over 20,000 square feet of office, storage and Parsons Odebrech, J. V. Building 3025 Miami, Fl33159 $ 16,000,000.00
<br />Miami International Allpon, Florida maintenance space that will allow Sumitomo Corporation to host their equipmem and train (people (305) 869.4200
<br />mover) controls.
<br /> Finally, completed the main mechanical, electrical, fire sprinkler, plumbing and building components
<br /> of the new CD Infill shell building that allowed the finish contracto" to proceed with their interior
<br /> installations
<br /> In post.9/ 11 America, security is a matter of great concern and sensitivity at or near airpons. 1he
<br /> controlled ponion of the aitpon where people bave direct access to aircraft is called the Airpott
<br /> Operation Area (AOA). The AOA encompasses all areas inside aitpon fencing designated and used
<br /> for landing, taking off, or swiace maneuveting of aircraft, including ramps, aprons, runwal' and
<br /> taxiways.
<br /> As pan of the AOA Perimeter Fence and Access Road project, TexTs work straddled the boundary
<br /> between the "landside" ponion of the AOA and all other AOA areas of Concourse A, cWTently unde
<br /> constrUCtion. TCO created the AOAseparation for Terminal Ainorderto allow this area to become
<br />AOAPERIMEIERFENCE B779.F landside. As a result, constrUCtion personnel can now perform dailyconstm.:tion activities without Gaibey Zreibi
<br />Miami International Allpott, Florida baving to pass through the security pnx:ess at the NOM T enninal Development Gate. Parsons Odebrech, J. V. gaibey.zreibi@pojvOntd.com $ 1,298,653.00
<br />The project proceeded in three phases: the AOAseparation at the apron and all building levels; the
<br /> constrUCtion of a new road to access the lands ide area; and the parking stripping, signage and control
<br /> point. TCO was required to follow strict protocols for maintaining the integrity of the secured AOA,
<br /> even as construct.ion took place.
<br /> Concowse A was closed to allow 70% of work to proceed landside, rather dun in the
<br /> aircraft-operating area, avoiding the need for increased securityclear.mces. JoOO W.
<br /> Cosper, fonner Deputy Director of Capital Improvements for J\.1DAD, said this would
<br /> sbave up to $200 million overall and speed up work by two years!
<br /> Project consist on the supply and installation of Hollow metal and stainless steel doors, frames and Dean G-ews
<br />BCCDooRS 739C, 7391, 740A bardware at the CD and B,Clnfill projects at the NOM Terminal Additionally, we will supply and Beucbamp Construction 2100 Ponce de Leon Blvd., Suite 825 $ 1,571,844.00
<br /> install architectural and specialty doors that are non automatic. Company, Inc. Coral Gables, FL 33134
<br /> 305,445.0819
<br /> Enrique Juarez
<br />VASCULAR ANGIOGRAPHY Jones Lang LaSalle
<br />SillIES @ JMH Interior renovation to house new imaging equipment with 4 le-ad lined imaging rooms Jackoon Memorial Hosprial 1611 NW 12th Ave. $ 1,749,316.00
<br />Miami, Florida Miami, Florida
<br /> (305) 585,7834
<br /> The pUlpose of the Florida Depanment of Juvenile Justice's lCARE boarding school is to rebabilitate
<br /> the lives of 36 troubled bol'o It is pan of the pilot BayPoint Scbools program established in 1995 for Ken Mostyn
<br />lCARE BAYP01NT SCHOOL 13. to 18-jelf-old juvenile delinquents, based on a theotythat these bol' are not mentally ill, sick or Depanment of Juvenile 2737 Centerview Dr. # 114
<br />born bad In place of treatment, education, behavior modification and moral development are $ 2,536,229.00
<br />Miami, Florida emphasized in an innovative approach 'The project consisted of new construction of a lWO-story, Justice Tallahassee, Florida 33606
<br /> 24,500 square-foot classroom building with approximately 11 classrooms targeted to accommodate 813-251-0565
<br /> 225 students.
<br />NIDC- Project 779J &779F.I. Access ConstrUCt new roadway to access the landside area and the parking strip, signage and control points. Maria Rios
<br />Rd & Landside Projects Parsons Odebrech, J. V. $ 1,436,919.00
<br />Miami International Airpon, Florida Additionally, Thornton build new parking lot with new barricades & striping 305.869.5656