My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pavarini
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
Pavarini
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 4:52:49 PM
Creation date
4/25/2011 4:40:30 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I" <br />I <br />I <br /> <br />No. 18 - Sail Structure <br />18a. Unit price to include all components <br />(sails, masts/structure, footings, cables, etc.) $ <br /> <br />No. 19 - Site Furnishings <br />19a. Cabana/Shelter Structures: <br />19b. Precast Lugo Mare Bench: <br />19c. Precast Slope Bench: <br />19d. Precast Nigra Chair: <br />1ge. Table with Umbrella: <br />19f. Table Chairs: <br />199. Picnic Tables and Benches: <br />19h. Flag Pole: <br />19i. Bike Racks: <br />19j. Trash Receptacles: <br /> <br />Each <br />Each <br />Each <br />Each <br />Each <br />Each <br />Each <br />Each <br />Each <br />Each <br /> <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br /> <br />The following documents are attached to and made a condition of this Bid: <br /> <br />a) Required Bid Security in form of AlA Document A310 Bid Bond (5%) <br /> <br />b) Required Contractor's Qualification Statement with supporting data per AlA A305 <br /> <br />The stipulated sum bid items include, but are not limited to: <br /> <br />c) All payments to be made by Contractor to its independent contractors, subcontractors, <br />suppliers, materialmen and employees; <br /> <br />d) The costs and expense of application for obtaining all necessary governmental permits, <br />licenses, insurances, and bonds which may be required in connection with the performance of <br />the Work; <br /> <br />e) All federal, state, county, municipal, and other taxes imposed by law and based upon labor, <br />services, materials, equipment, or other items acquired, performed, furnished or used for or <br />in connection with the Work, including but not limited to sales, use and personal property <br />taxes payable by or levied or assessed against the Owner, Contractor or Subcontractors. <br />Whether the law requires any such taxes to be stated and charged separately, the total price <br />of all items included in the Work plus the amount of such taxes shall not exceed the <br />stipulated lump sum bid items. <br /> <br />Before commencing with any work, the Bidder shall comply with all requirements of insurance and bonds <br />as defined in the contract documents. Delays in complying with the requirements will not result in an <br />extension of the completion date. <br /> <br />Failure to satisfy the Bond and Insurance provisions of the Contract Documents are deemed a material <br />breech of this contract. <br /> <br />BID FORM-Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.