My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pavarini
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
Pavarini
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 4:52:49 PM
Creation date
4/25/2011 4:40:30 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />:I <br />~ <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I. <br />I <br />,. <br />,. <br />. <br />I <br />. <br />, <br />. <br />I <br /> <br />-, <br />I <br />I- <br />I. <br />~. <br />I <br /> <br />#{ PAVARINI <br /> <br />~ CONSTRUCTION COMPANY <br /> <br />48. ALTERNATIVES <br /> <br />1. Use four (4) sided Composite Metal Panels "Y" System in lieu of Metal Frame, Lath, Stucco, and Paint "Y" System <br />ADD: $855,400 <br /> <br />2. Use an alternate light fixture package with similar performance characteristics <br />DEDUCT: $20,000 <br /> <br />3. Projected sales tax savings under a qualified Owner direct purchase / sales tax exempt program <br />DEDUCT: $127,000 <br /> <br />4. If Owner should elect to pay other governmental agency fees related to this project in addition paying building <br />department permit fees are <br />DEDUCT: $72,200 <br /> <br />5. Use 150 fpm hydraulic elevator speed in lieu of 200 fpm <br />DEDUCT: $28,100 <br /> <br />6. Use standard storefront system with vertical mullions and NOC <br />DEDUCT: $11,300 <br /> <br />7. Eliminate interior wall painting of CMU walls and leave as exposed at: storage room, elevator control room, electrical <br />room, general storage and stairwells <br />DEDUCT: $3,500 <br /> <br />8. Use St. Augustine sod in lieu of "Paspalum" sod (under the current landscape design) <br />DEDUCT: $4,070 <br /> <br />9. If Owner should elect to pay for the FPL Switching Station/Transformer required for temporary power <br />ADD: $37,000 <br /> <br />10. Use stainless steel flagpoles (specifications) in lieu of aluminum as reflected and indicated on the drawings <br />ADD: $39,200 <br /> <br />11. Use Maleluca mulch in lieu of specified Eucalyptus <br />DEDUCT: $4,300 <br /> <br />12. Add fire valve cabinet if required (not indicated) <br />ADD: $300/EACH <br /> <br /> <br />BID PROPOSAL TO PROVIDE PROFESSIOl'olAL COl'olSTRUCTIOl'ol SERVICES FOR <br />THE HERITAGE PARK Al'oID PARKll'oIG GARAGE I CITY OF SUl'oIl'oIY ISLES BEACH. FL <br /> <br />~.~oo....,.. <br />. '~ <br />. ~ . <br />0.. ... "". <br />-.... ..o.,9~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.