Laserfiche WebLink
<br />.. <br />. <br />I <br />. <br />. <br /> <br />I- <br />- <br />. <br />. <br />I <br />\- <br />"T <br />. <br />I <br /> <br />. <br />I <br />. <br /> <br />. <br />t <br />. <br /> <br />. <br />~ <br /> <br />. <br />. <br />. <br />. <br />I <br />. <br />I <br />. <br />. <br />. <br />. <br />I <br />. <br />I <br />. <br />. <br />. <br />I <br />n <br />~ <br /> <br />#~ PAVARINI <br /> <br />~ CONSTRUCTION COMPANY <br /> <br />5. BASE PARK OPTION <br /> <br />PARK ALONE PARK AND GARAGE <br /> <br />OPTIONS <br /> <br />$633,616 <br /> <br />$7,815,183 <br /> <br />Base Cost <br /> <br />$7,181,567 <br /> <br />· Includes Driveway Costs <br /> <br />Pavarini is submitting the cost for the Base Park Option to include the following (see attached plan): <br /> <br />Driveway leading to the garage <br />· Chain link fence around the perimeter with three points of entry gates <br />St. Augustine Sod in lieu of Paspalum Sod entire area of Phase II <br />Irrigation system of entire area phase II <br />· Concrete Paver entry feature at the corner of 193 Street and Collins Avenue <br />· Two (2) Tree Grates <br /> <br />. If the Owner wants to eliminate the Underground Storm Drainage System within phase II as per designed Civil <br />Drawings: DEDUCT $ 70,000 <br /> <br /> <br />f)........ <br />IJ' ., <br />\ <br />"0,. -~: <br />""'0.,0 <br /> <br />BID PROPOSAL TO PROVIDE PROFESSIONAL CONSTRUCTION SERVICES FOR <br />THE HERITAGE PARK AND PARKING GARAGE I CITY OF SUNNY ISLES BEACH. FL <br />