My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pirtle
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
Pirtle
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2011 4:48:42 PM
Creation date
4/25/2011 4:47:40 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />HERITAGE PARK AND PARKING GARAGE <br /> <br />It is necessary to not only to identify construction tasks specifically but also included <br />durations for the shop drawing creation and review process required prior to performing the <br />task. During the planning phase of the project, a "required on job site" date is established <br />for all materials necessary for the timely completion of the project. Shop drawings and <br />submittals for each item are then scheduled working backwards from the required on job <br />site date, allowing time for creation and review of the submittals along with actual fabrication <br />and delivery times. Each shop drawing or submittal activity is then reviewed on a weekly basis <br />to ensure that they are processed in a timely fashion in order to prevent delays to the project. <br />Initial coordination drawings are required prior to any fabrication and actual construction <br />activity. Subcontractor's schedule input is continuously updated and incorporated in the _ <br />baseline and updated schedule. <br />The following chart, shows the initial schedule and the final schedules for a few of our <br />projects completed recently: <br />Proiect Name Construction Qri..gjn;ll ~I Contract Comoletion Difference <br />.l'ilf. Comoletion Comoletion ~ ~ <br /> <br />8. CONSTRUCTION SCHEDULING <br /> <br />We have analyzed and studied this project and have provided a proposed schedule shown in <br />Section 9 on page 10. Our scheduling process is proven and begins with the development of <br />an accurate project schedule, specifically tailored for your project. In order to produce a <br />schedule that is reliable and of the quality required for use as a project management tool, it <br />is necessary to involve all parties (City of Sunny Isles Beach, Spillis Candela DMJM, Engineers, <br />Consultants, Subcontractors, Permitting Agency, and Pirtle) during its creation. By combining <br />input from all team members and by making a series of judgments based on past performance, <br />our firm has been able to consistently produce efficient and timely project schedules that all <br />parties can achieve. <br /> <br />The project schedule is a living document that will be analyzed, critiqued and revised on a <br />continuous basis throughout the process as more information about the building and system <br />designs are provided. Our team uses Primavera P5 Project Scheduler to create the project <br />schedule. <br /> <br />Pirtle Construction Project Schedules Include: <br />Electronic Reporting - Continuous Updates <br />Established Critical Milestones <br />Perm it Approval <br />Coordination Drawings and Specifications <br />All submittals, approvals and coordination of shop drawings <br />Review long lead Items and critical delivery of materials <br />Coordinate off-site work and Agency reviews, approvals and acceptance <br />Move-In activities with owner interface <br />Monitor and update all progress with need changes in schedule <br />End user involvement, close-out, move in procedures and warranty <br /> <br /> <br />--...... <br /> <br />=...:.---::::,.:::: <br />- --- <br />--,., -- <br />- -- <br />- ---- <br />....- -- <br />- -- <br />-~ -- <br />----- <br /> <br />I <br />- I <br />,;=--- ~E:~ <br /> <br /> <br />~ <br /> <br />C' , f <br /> <br /> <br /> <br />South Broward Hi h School 7/19/200 5/1/2003 8/14/2002 1016 756 <br />Rockwa Middle School. Modular Classroom Addition and Renovation 2/212006 2/2/2007 8/11/200 365 190 <br />Pine Rid e Alternative Center Re racement School 3/21/200 10/181200 5/2/2006 576 407 <br />John F. Kenned Middle School 3123/200 1/17/2007 8/131200 300 143 <br />Redland Elementa 3/21/200 8/18/200 4/7/2005 150 17 <br />Claude Pe er Elementa 1217/2004 10/1/200 6/1/2005 298 176 <br />J_P, Taravella Hi h School- TPM 2/15/200 11/12/200 7/24/200 270 159 <br />Mar ate Elementa -TPM5 2/15/200 11/12/200 7/24/200 270 159 <br />Millennium Middle . TPM 2/15/200 11/12/200 7/24/200 270 159 <br />Coral S rin s Elementa -TPM 2/15/200 11/12/200 7/241200 270 159 <br />Walker Elementa -TPM 2/15/200 11/12/200 7/24/200 270 159 .. <br />5 arts lex 4/18/200 7/30/2004 4/10/2004 469 358 <br />Driftwood Center and Ballfield Renovation 9/14/2001 9124/2002 6/7/2002 375 266 <br />West Boca Raton Communit Hi h School LlL 9/16/2002 8/16/2004 5/6/2004 700 598 <br /> Ahead of Schedule II <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.