My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DooleyMack
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
DooleyMack
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 3:52:34 PM
Creation date
4/26/2011 3:52:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />RELATED EXPERIENCE / <br />REFERENCES <br /> <br />St. Lucie County <br />Special Needs Shelter <br /> <br /> <br /> <br />~~ <br />'~"~~ <br />~~~:.~ <br />~ <br />;ty- <br /> <br />DESCRIPTION: New construction ofa 2-story, 62,600 square foot building designed and consisting of an <br />auditorium, recreation hall and emergency shelter. As an emergency shelter it accommodates 500 evacuees, <br />250 support staff and was designed utilizing tilt-up concrete wall construction built to withstand 180 mph <br />winds, with a 1500 kw generator for emergency power and water supply. Other features include: a specially <br />sealed room for safe oxygen storage, electrical cords that can cascade from the ceiling for medical equipment <br />requiring electricity, a triage area, extra wide hallways and closet-sized showers outfitted with benches in the <br />locker room. The facility houses a 24,000 sf gymnasium/auditorium, multi-purpose/staff sleeping quarters, a <br />kitchen and 14 offIces. The center incorporates extensive green building technology with up to 75 percent <br />recycled steel, 50 percent recycled aluminum, gypsum board with recycled facings and pavement with no <br />asphalt. <br /> <br />CONTRACT AMOUNT: $12,720,633.00 <br /> <br />COMPLETION DATE: July 2008 <br /> <br />OWNER / REFERENCE: <br /> <br />St. Lucie County <br />2300 Virginia Avenue <br />Ft. Pierce, FL 34982 <br />Jerry Parenteau <br />772-462-2567 <br /> <br />Parkland Golf & Country Club <br /> <br /> <br /> <br />DESCRIPTION High-end master-planned community main entrance landscaping with Audubon <br />Pond, rotary, and other main entry water features located in upscale Parkland, Florida. The Audu- <br />bon Pond is a 2.6 acre Audubon-certifIed garden 70% populated with native Florida plants to create <br />three habitats: pine flatwood, oak hammock, and cypress swamp. <br /> <br />CONTRACT AMOUNT: $ 5,471,807 <br /> <br />COMPLETION DATE: August 2006 <br /> <br />OWNER / REFERENCE: <br /> <br />WCI Communities, Inc. Land Development <br />11575 Heron Bay Blvd. 2nd floor <br />Coral Springs, Florida 33076 <br />Sam Bavarro <br />954-575-4200 <br /> <br />~ <br />doole~~~ <br /> <br />/0 <br /> <br />r <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.