My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2010-1576
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2010
>
Reso 2010-1576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2011 4:52:02 PM
Creation date
5/9/2011 4:51:57 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2010-1576
Date (mm/dd/yyyy)
07/15/2010
Description
Amendment to Agmt w/ATS for Red Light Camera Program.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT "B" <br />Construction and Installation Obliqations <br /> <br />Timeframe for Installation: Traffic Safety Camera Proqram <br /> <br />Vendor will have each specified intersection installed and activated in phases in <br />accordance with an implementation plan to be mutually agreed to by Vendor and the <br />City Manager. <br /> <br />Vendor will use reasonable commercial efforts to install the system in accordance with <br />the schedule set forth in the implementation plan that will be formalized upon project <br />commencement. <br /> <br />Vendor will use reasonable commercial efforts to install and activate all specified <br />intersections within forty-five (45) days subsequent to receipt of all permits required by <br />Section 1.4 of this Exhibit B. <br /> <br />1. Vendor Obliqations. Vendor shall do or cause to be done each of the following <br />(in each case, unless otherwise stated below, at Vendor's sole expense): <br /> <br />1.1 Appoint the Vendor Project Manager and a project implementation team <br />consisting of between one (1) and four (4) people to assist the Vendor <br />Project Manager; <br /> <br />1.2 Request current "as-built" electronic engineering drawings for the <br />Designated Intersections (the "Drawings") from the County traffic <br />engineer; <br /> <br />1.3 Develop and submit to the City for approval construction and installation <br />specifications in reasonable detail for the Designated Intersection, <br />including but not limited to specifications for all radar sensors, pavement <br />loops, electrical connections, and traffic controller connections, as <br />required; <br /> <br />1.4 Seek approval from the relevant Governmental Authorities having <br />authority or jurisdiction over the construction and installation specifications <br />for the Designated Intersection (collectively, the "Approvals"), which will <br />include compliance with City permit applications; <br /> <br />1.5 Seek rights from private property owners, as necessary for the placement <br />of System Equipment at designated intersections where Governmental <br />Authorities have jurisdiction over the designated intersection and adjacent <br />rights of right of way, and such Governmental Entity denies authority to <br />Vendor for the installation of its equipment; <br /> <br />1.6 Finalize the acquisition of the Approvals; <br /> <br />1.7 Submit to the City a public awareness strategy for the City's consideration <br />and approval, which strategy shall include media and educational <br /> <br />Confidential <br />Page 8 of 16 <br /> <br />~llnn\l lelo.e ~I l1TC::: rl"'\nt,.~,..t An"'lo.nrlr"v"u=:tont "'''1'' n~ 1~ <br /> <br />("'it\!,...f C:::"nn\l 1C!I.o.C! 1:'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.