My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. I
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:15:43 AM
Creation date
5/12/2011 10:58:23 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure at 175th & Collins
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />II <br />. <br /> <br />,., <br />. <br /> <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION <br /> <br />~ <br />. Change the first sentence of Paragraph 9.01.A. to read as follows: <br /> <br />r"'1 "If OWNER and ENGINEER agree, ENGINEER will be OWNER's representative <br />. during the construction period." <br /> <br />.., ARTICLE 10 - CHANGES IN THE WORK; CLAIMS <br />. <br /> <br />Add the following: <br /> <br />..., <br />. <br /> <br />,., <br />. <br /> <br />"10.06. Without invalidating the agreement, Owner may, at any time <br />execute appropriate Change Orders for additions and/or deletions in the work <br />of up to 25% of the total contract amount, without a change in the contract <br />unit prices bid." <br /> <br />., <br />. <br /> <br />ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, <br />REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK <br /> <br />,., <br />. <br /> <br />Delete13.03.B.and replace with: <br /> <br />,., <br />. <br /> <br />"AIl testing shall be paid for by the Contractor." <br />Add the following sentence to Paragraph 13.07.A.: <br /> <br />.., <br /> <br />"Specific and special warranties specified in the Contract Documents are in <br />addition to, and not in lieu of, the contractors general warranty. <br />CONTRACTOR shall not be relieved of general warranty obligations by the <br />specification of specific products or procedures." <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />13.09. In the first sentence of the paragraph OWNER, change the first line from "If <br />Contractor fails within a reasonable time after written notice of Engineer..." to read: <br /> <br />,., <br />. <br /> <br />"If Contractor fails within ten (10) calendar days after written notice of <br />Engineer..." <br /> <br />..., <br /> <br />. <br /> <br />ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION <br /> <br />r"1 <br /> <br />In the first sentence of Paragraph 14.02.A.1., change the phrase "At least twenty days <br />before each progress payment is scheduled (but not more often than once a month), ..." to <br />read: <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />"By no later than the first day of the month, ...". <br /> <br />r"'1 <br />. <br /> <br />Following Paragraph 14.02.A.3 add: <br /> <br />4. <br /> <br />An original Partial Release of Lien is required from the General <br />Contractor along with the application for Payment No. 1 and for each <br /> <br />.., <br /> <br />. <br /> <br />- <br /> <br />09/09 <br /> <br />00800- 7 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.