My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. I
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:15:43 AM
Creation date
5/12/2011 10:58:23 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure at 175th & Collins
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r, <br />. <br />., <br />. <br />..., <br />. <br />~ <br />. <br />r"] <br />. <br />,.., <br />. <br />., <br />. <br />" <br />. <br />n <br />. <br />r1 <br />. <br />n <br />. <br />~ <br />. <br />~ <br />. <br />r, <br />. <br />r, <br />. <br />.., <br />. <br />..., <br />. <br />.., <br />. <br />" <br />. 09/09 <br /> <br />MEDIAN CLOSURE AT NE 175TH TERRACE ON COLLINS AVE. AND SR A1A1COLLlNS AVE. AT <br />183RD ST STREETSCAPE IMPROVEMENTS <br />Bid Estimated Estimated <br />Item Description Quantity Unit Unit Price Total <br /> <br />I. General <br />1 Mobilization/Demobilization (< 5 % of total bid) <br /> <br />2 MOT <br /> <br />1 LS <br />1.0 LS <br /> <br />Sub-Total General <br /> <br />II. Median Closure at NE 175th Terrace <br />3 Proposed Median Closure (complete) including all labor, <br />equipment,permits and materials necessary for final <br />product. Complete median closure to include, but not <br />limited to, all excavation, backfill, compaction, base, <br />subgrade, paving, curbing, striping, signage, landscape <br />and irrigation as indicated in plans. <br /> <br />Sub-Total Median Closure at NE 175th Terrace <br /> <br />III. Streetscape Improvements <br />A. Treeand Palm protection, removal and relocation <br />4 Tree and Palm protection 3"-24" caliper <br />5 Tree and Palm removal 3" - 12" caliper <br />6 Tree and Palm removal 13" - 24" caliper <br />7 Tree and Palm relocation 3" - 12" caliper <br />8 Tree and Palm relocation 13" - 24" caliper <br /> <br />7 EA <br />2 EA <br />9 EA <br />7 EA <br />19 EA <br /> <br />B. Paving <br />9 Pavers set on sand <br />10 Pavers set on concrete <br /> <br />5,270 SF <br />292 SF <br /> <br />C. Irrigation Equipment (Furnish and Install) <br />11 Automatic Controller Rainbird esp-lxm-sm8 <br />12 Rain Sensor Switch Hunter mini-click-c-bpsw <br />13 Automatic Electric Valve Rainbird 150-peb-prs-d <br />14 Gate Valve Nibco T-113 <br />15 Valve Box Quazite pg 1324bb 18 <br />16 Valve Box Covers Quazite pg 1324caOO <br />17 1-1/2" Irrigation Main PVC plastic pipe and fittings <br />18 2" Irrigation Main PVC plastic pipe and fittings <br /> <br />1 EA <br />1 EA <br />4 EA <br />1 EA <br />5 EA <br />5 EA <br />7 LF <br />41 5 LF <br /> <br />D. Sprinklers Including Associated Swingjoint. Piping. <br />and Fittin~s <br />19 Toro 570z-4p <br /> <br />409 EA <br /> <br />E. Furnishings (Furnish and Install) <br />20 Steel Bench Dumor 119 Series 74"1 x28"d x 32"ht <br />21 Steel Litter Receptable Dumor 84-22-fto 28"dia x 32"ht <br /> <br />6 EA <br /> <br />4 EA <br /> <br />22 Bus Stop Shelter Tolar Shelters 6549-00 0301354 solar <br />lighting 13'1 x 4'-8"d x 8'-2"ht EA <br /> <br />LS <br /> <br />00300-2 03-4122.F <br />
The URL can be used to link to this page
Your browser does not support the video tag.