<br />2. Each submittal shall bear a stamp or specific
<br />written certification that Contractor has satisfied
<br />Contractor's obligations under the Contract Documents
<br />
<br />EJCDC C-700 Standard General Conditions of the Construction Contract.
<br />Copyright i!:l2002 National Society of Professional Engineers for EJCDC. All rights reserved.
<br />00700 - 23
<br />
<br />,.,
<br />.
<br />
<br />ings or Specifications or to the acts or omissions of
<br />Owner or Engineer or , or anyone employed by any of
<br />them, or anyone for whose acts any of them may be
<br />liable, and not attributable, directly or indirectly, in whole
<br />or in part, to the fault or negligence of Contractor or any
<br />Subcontractor, Supplier, or other individual or entity
<br />directly or indirectly employed by any of them).
<br />
<br />I
<br />
<br />r'1
<br />.
<br />
<br />I
<br />
<br />D. Contractor's duties and responsibilities for
<br />safety and for protection of the Work shall continue until
<br />such time as all the Work is completed and Engineer has
<br />issued a notice to Owner and Contractor in accordance
<br />with Paragraph 14.07.B that the Work is acceptable
<br />(except as otherwise expressly provided in connection
<br />with Substantial Completion).
<br />
<br />I
<br />
<br />.,
<br />.
<br />
<br />6.14 Safety Representative
<br />
<br />,...,
<br />.
<br />
<br />A. Contractor shall designate a qualified and
<br />experienced safety representative at the Site whose duties
<br />and responsibilities shall be the prevention of accidents
<br />and the maintaining and supervising of safety precautions
<br />and programs.
<br />
<br />,.,
<br />.
<br />
<br />6.15 Hazard Communication Programs
<br />
<br />I
<br />
<br />A. Contractor shall be responsible for coordi-
<br />nating any exchange of material safety data sheets or
<br />other hazard communication information required to be
<br />made available to or exchanged between or among
<br />employers at the Site in accordance with Laws or
<br />Regulations.
<br />
<br />,.,
<br />.
<br />
<br />~
<br />
<br />6.16 Emergencies
<br />
<br />.
<br />
<br />A. In emergencies affecting the safety or protec-
<br />tion of persons or the Work or property at the Site or
<br />adjacent thereto, Contractor is obligated to act to prevent
<br />threatened damage, injury, or loss. Contractor shall give
<br />Engineer prompt written notice if Contractor believes that
<br />any significant changes in the Work or variations from the
<br />Contract Documents have been caused thereby or are
<br />required as a result thereof. If Engineer determines that a
<br />change in the Contract Documents is required because of
<br />the action taken by Contractor in response to such an
<br />emergency, a Work Change Directive or Change Order
<br />will be issued.
<br />
<br />M
<br />
<br />.
<br />
<br />r"'1
<br />.
<br />
<br />r'1
<br />.
<br />
<br />,..,
<br />.
<br />
<br />6.17 Shop Drawings and Samples
<br />
<br />,..,
<br />.
<br />
<br />A. Contractor shall submit Shop Drawings and
<br />Samples to Engineer for review and approval in accor-
<br />dance with the acceptable Schedule of Submittals (as
<br />required by Paragraph 2.07). Each submittal will be
<br />identified as Engineer may require.
<br />
<br />n
<br />
<br />.
<br />
<br />1. Shop Drawings
<br />
<br />....,
<br />
<br />a. Submit number of copies specified in the
<br />General Requirements,
<br />
<br />.
<br />
<br />....,
<br />
<br />.
<br />
<br />b. Data shown on the Shop Drawings will be
<br />complete with respect to quantities, dimensions,
<br />specified performance and design criteria,
<br />materials, and similar data to show Engineer the
<br />services, materials, and equipment Contractor
<br />proposes to provide and to enable Engineer to
<br />review the information for the limited purposes
<br />required by Paragraph 6.17.0.
<br />
<br />2. Samples: Contractor shall also submit
<br />Samples to Engineer for review and approval in accor-
<br />dance with the acceptable schedule of Shop Drawings and
<br />Sample submittals.
<br />
<br />a. Submit number of Samples specified in the
<br />Specifications.
<br />
<br />b. Clearly identify each Sample as to material,
<br />Supplier, pertinent data such as catalog numbers,
<br />the use for which intended and other data as
<br />Engineer may require to enable Engineer to
<br />review the submittal for the limited purposes
<br />required by Paragraph 6.17.D.
<br />
<br />B. Where a Shop Drawing or Sample is required
<br />by the Contract Documents or the Schedule of Submittals
<br />, any related Work performed prior to Engineer's review
<br />and approval of the pertinent submittal will be at the sole
<br />expense and responsibility of Contractor.
<br />
<br />C. Submittal Procedures
<br />
<br />1. Before submitting each Shop Drawing or
<br />Sample, Contractor shall have determined and verified:
<br />
<br />a. all field measurements, quantities, dimensions,
<br />specified performance and design criteria,
<br />installation requirements, materials, catalog
<br />numbers, and similar information with respect
<br />thereto;
<br />
<br />b. the suitability of all materials with respect to
<br />intended use, fabrication, shipping, handling,
<br />storage, assembly, and installation pertaining to
<br />the performance of the Work;
<br />
<br />c. all information relative to Contractor's
<br />responsibilities for means, methods, techniques,
<br />sequences, and procedures of construction, and
<br />safety precautions and programs incident thereto;
<br />and
<br />
<br />d. shall also have reviewed and coordinated each
<br />
<br />Shop Drawing or Sample
<br />Drawings and Samples
<br />requirements of the Work
<br />Documents,
<br />
<br />with other Shop
<br />and with the
<br />and the Contract
<br />
|