My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. I
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:15:43 AM
Creation date
5/12/2011 10:58:23 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure at 175th & Collins
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.., <br /> <br />. <br /> <br />il <br />. <br /> <br />of the Work, submit evidence satisfactory to OWNER that such bonds will be <br />furnished. " <br /> <br />., <br />. <br /> <br />In the first line of Paragraph 2.02. change the term" ...ten..." to read: <br /> <br />1"'1 <br />. <br /> <br />"...six(6l..." . <br /> <br />Delete Paragraph 2.03. and replace with the following: <br /> <br />1"1 <br />. <br /> <br />"The date of commencement of the Work is the date established in a Notice <br />to Proceed." <br />Add the following to Paragraph 2.05.: <br /> <br />r'1 <br />. <br /> <br />.., <br />. <br /> <br />B. CONTRACTOR shall perform no portion of the Work at any time without <br />Contract Documents or, where specified, approved Shop Drawings for such <br />portion of the Work. <br />C. By executing the Contract, CONTRACTOR represents that he has visited <br />the site, familiarized himself with the local conditions under which the Work <br />is to be performed, and correlated his observations with the requirements of <br />the Contract Documents." <br /> <br />r-1 <br />. <br /> <br />r, <br />. <br /> <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE <br /> <br />'"1 <br />. <br /> <br />Add the following to Paragraph 3.02.A.: <br /> <br />~ <br /> <br />"3. Sections of Division One - General Requirements govern the execution <br />of all sections of the Specifications." <br /> <br />. <br /> <br />r., <br /> <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND <br />PHYSICAL CONDITIONS; REFERENCE POINTS <br /> <br />. <br /> <br />In Paragraph 4.02.A., change the term" ...Supplementary Conditions..." to read: <br /> <br />.., <br /> <br />. <br /> <br />"...bidding requirements...". <br /> <br />., <br />. <br /> <br />In Paragraph 4.02.B., change the term "Supplementary Conditions..." to read: <br /> <br />"...bidding requirements...". <br /> <br />II <br />. <br /> <br />ARTICLE 5 - BONDS AND INSURANCE <br /> <br />...., <br />. <br /> <br />In the first line of Paragraph 5.04., following the word "...insurance...", insert the words: <br /> <br />r""I <br />. <br /> <br />"... with a company or companies licensed to do business in the State of <br />Florida,..." . <br /> <br />In the last line of Paragraph 5.04.A.6., following the word" ...vehicle.", insert the words: <br /> <br />1'""'1 <br /> <br />. <br /> <br />,..., <br /> <br />09/09 <br /> <br />00800-2 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.