My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.., <br /> <br />. <br /> <br />1"'"1 <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />,., <br />. <br /> <br />" <br />. <br /> <br />" <br />. <br /> <br />" <br />. <br /> <br />,., <br />. <br /> <br />.., <br />. <br /> <br />,., <br />. <br /> <br />I""l <br /> <br />. <br /> <br />n <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />I""l <br /> <br />. <br /> <br />I 1 <br /> <br />. <br /> <br />r . <br /> <br />. <br /> <br />TABLE 4 <br /> Maximum Allowable <br />Application Chloride Content Ib/yd3 [kg/m3] <br /> Production Mix Design <br />Non Reinforced Concrete N/A N/A <br />Reinforced Concrete that does not require Type II cement 0.70 [0.42] 0.64 [0.38] <br />plus slag or pozzolan(s) <br />All applications that require Type II cement plus 0.40 [0.24] 0.34 [0.20] <br />pozzolan(s) <br />Prestressed Concrete 0.40 [0.24] 0.34 [0.20] <br /> <br />Determine the chloride content as the average of three tests on <br />samples taken from the concrete. Ensure that the range of results of the three tests does <br />not exceed a chloride content of 0.08 Ib/yd3 [0.05 kg/m3] of concrete. When test results <br />are outside of the allowable range, run an additional three tests until the test results are <br />within the allowable range. The Contractor may obtain samples from representative <br />concrete cylinders or cores tested for compressive strength. If the cylinders or cores have <br />been exposed to salt or aggressive environment, discard the outer 1 inch [25 mm] surface <br />of the sample. <br />346-4.2.2 Sampling and Testing: Determine the chloride content in <br />accordance with FM 5-516 within two weeks of sampling. <br />(1) For all concrete requiring Type II cement with pozzolan(s) or slag <br />and prestressed concrete, determine the chloride content on a frequency that is in <br />accordance with these Specifications and the following procedures: <br />(a) When the chloride content is 0.25 Ib/yd3 [0.15 kg/m3] or <br />less, determine chloride content at a frequency of not less than one for every four weeks <br />of production as long as the test results remain at or below 0.25 Ib/yd3 [0.15 kg/m3]. As <br />an exception to the aforementioned testing frequency, when eight consecutive tests show <br />chloride content below 0.25 Ib/yd3 [0.15 kg/m3], the Engineer may reduce the frequency to <br />not less than one for every eight weeks of production. <br />(b) When the chloride content is greater than 0.25 [0.15] and <br />less than or equal to 0.33 Ib/yd3 [0.20 kg/m3], determine chloride content at a frequency of <br />not less than one for every two weeks of production, as long as the values remain at or <br />below 0.33 Ib/yd3 [0.20 kg/m3]. <br />(c) When the chloride content is greater than 0.33 Ib/yd3 <br />[0.20 kg/m3], make subsequent chloride content tests for each day's production. <br />(2) For all reinforced concrete, other than the concrete covered in (1) <br />above, determine the chloride content on a frequency of not less than one test every four <br />weeks. As an exception to the aforementioned testing frequency, when eight consecutive <br />chloride content determinations are below 0.40 Ib/yd3 [0.24 kg/m3] of concrete, the <br />Engineer may reduce the frequency to not less than one for every eight weeks of <br />production. <br />For any case listed above, when the source of any concrete <br />component material, including admixtures, is changed, determine the chloride content <br />immediately. <br /> <br />09/09 <br /> <br />01000-96 <br /> <br />03-4122.F <br />
The URL can be used to link to this page
Your browser does not support the video tag.