My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.., <br /> <br />. <br /> <br />.., <br />. <br /> <br />,., <br />. <br /> <br />TABLE 5 <br />Description 1M ethod <br />correction factors for each type of aggregate at the concrete production facility. <br />* *For lOTs selected for verification testing use the same size cylinder molds as the <br />Department uses for Verification tests. For the compressive strength testing of precas <br />concrete the use of 4 inch x 8 inch [102 x 203 mm] test cylinders are allowed, provided <br />hey meet the requirements of 450-4.1. <br /> <br />~ <br />. <br /> <br />M <br /> <br />346-6 Control of Quality. <br />346-6.1 General: Develop a Quality Control Plan (QCP) as specified in 6-8. Assume <br />responsibility for meeting the requirements of the approved QCP and Contract Documents. <br />Ensure the QCP includes the necessary requirements to control the quality of the concrete. <br />QC activities are performed by the Contractor to ensure materials, methods, <br />techniques, personnel, procedures and processes utilized during production meet the <br />specified requirements. <br />Accept the responsibility for performing QC inspections on all phases of <br />work. Ensure all materials and workmanship incorporated into the project meet the <br />requirements of the Contract Documents. <br />When concrete plastic properties (slump, air content and temperature) could <br />be significantly affected by handling between the point of delivery and the point of final <br />placement, including the use of pumps, conveyor belts, troughs, chutes, barge transport or <br />other means, provide in the QCP provisions to sample the plastic concrete for all testing at <br />the point of final placement, as a minimum. <br />Ensure the QCP includes any anticipated requirements for adjusting the <br />concrete at the placement site. Include the testing procedures that will be implemented to <br />control the quality of the concrete and ensure that concrete placed is within the target <br />range. Also, include provisions for the addition of water to concrete delivered to the <br />placement site at designated level areas, to ensure the allowable amount of water stated <br />on the concrete delivery ticket or the maximum water/cementitious materials ratio on the <br />approved design mix are not exceeded. Ensure the anticipated ranges of jobsite water <br />additions are described and the proposed methods of measuring water for concrete <br />adjustments are included. <br />Failure to meet the requirements of this Specification or the QCP will <br />automatically void that portion of the QCP. To obtain QCP re-approval, implement <br />corrective actions as approved by the Engineer. The Engineer may allow the Contractor to <br />continue any ongoing concrete placement but the Engineer will not accept concrete for any <br />new placement until the QCP reapproval is given by the Engineer. <br />346-6.2 Concrete Design Mix: Provide concrete that has been produced in <br />accordance with a Department approved design mix, in a uniform mass free from balls and <br />lumps. Discharge the concrete in a manner satisfactory to the Engineer. Perform <br />demonstration batches to ensure complete and thorough placements in complex elements, <br />when requested by the Engineer. <br />Do not place concretes of different compositions such that the plastic <br />concretes may combine, except where the plans require concrete both with and without <br />silica fume, metakaolin or calcium nitrite in a continuous placement. Produce these <br />concretes using two separate design mixes. For example, designate the mix with calcium <br />nitrite as the original mix and the mix without calcium nitrite as the redesigned mix. Ensure <br />that both mixes contain the same cement, fly ash or slag, coarse and fine aggregates and <br /> <br />,., <br />. <br /> <br />,.., <br />. <br /> <br />., <br />. <br /> <br />.., <br />. <br /> <br />I <br /> <br />II <br />. <br /> <br />., <br /> <br />. <br /> <br />. <br /> <br />~ <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />...., <br /> <br />- <br /> <br />n <br /> <br />09/09 <br /> <br />01000-98 <br /> <br />03-4122.F <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.