My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r"1 <br /> <br />. <br /> <br />, <br />. <br /> <br />., <br />. <br /> <br />moisture test approximately half way through the batching operations and adjust batch <br />proportions accordingly. <br />Ensure that the calibration of the measuring devices of the concrete <br />production facilities meets the requirements of Chapter 531 of the Florida Statutes. At <br />least quarterly, ensure that all scales, meters and other weighing or measuring devices are <br />checked for accuracy by a qualified representative of a scale company registered with the <br />Bureau of Weights and Measures of the Florida Department of Agriculture. Have the <br />accuracy of admixture measuring dispensers certified annually by the admixture supplier. <br />When Volumetric Mixers are used, deliver concrete in accordance with the <br />requirements of Volumetric Mixer Manufactures Bureau (VMMB) and ensure that the <br />vehicle has a VMMB registered rating plate. <br />347-3.2 Mixers: Ensure that mixers are capable of combining the components of <br />concrete into a thoroughly mixed and uniform mass, free from balls or lumps of <br />cementitious materials, and capable of discharging the concrete uniformly. Operate <br />concrete mixers at speeds per the manufacturer's design. Do not exceed the <br />manufacturer's rated capacity for the volume of mixed concrete in the mixer, mixing drum, <br />or container. <br />347-3.3 Delivery: The maximum allowable mixing and agitation time of concrete is <br />120 minutes. <br />347-3.4 Small Quantities of Concrete: With approval of the District Materials <br />Engineer, small quantities of concrete, less than 3 yd3 placed in one day and less than <br />0.5 yd3 placed in a single placement may be accepted using a pre-bagged mixture. The <br />Engineer will verify that the pre-bagged mixture is prepared in accordance with the <br />manufactures recommendations and will meet the requirements of this Specification. <br /> <br />..., <br /> <br />. <br /> <br />,., <br />. <br /> <br />,.., <br /> <br />. <br /> <br />II <br />. <br /> <br />.., <br />. <br /> <br />,., <br />. <br /> <br />., <br />. <br /> <br />,..., <br /> <br />347-4 Control of Quality. <br />347-4.1 Concrete Mix Design: Before producing any concrete, submit the proposed <br />mix design to the Engineer on a form provided by the Department. Use only concrete mix <br />designs having prior approval of the Engineer. <br />Materials may be adjusted provided that the theoretical yield requirement of <br />the approved mix design is met. Show all required original approved design mix data and <br />batch adjustments and substituted material on the Department concrete delivery ticket. <br />The Engineer may disqualify any concrete production facility for non-compliance with <br />Specification requirements. <br />347-4.2 Sampling and Testing: The Engineer may sample and test the concrete at <br />their discretion to verify its quality. The minimum 28-day compressive strength requirement <br />for this concrete is 2,500 psi. <br />347-4.3 Records: Maintain the following records for review for at least three years <br />after final acceptance of the project: <br />1. Approved concrete mix designs. <br />2. Materials source (delivery tickets, certifications, certified mill test reports). <br />3. A copy of the scale company or testing agency report showing the <br />observed deviations from quantities checked during calibration of the scales and meters. <br />4. A copy of the documentation certifying the admixture weighing/measuring <br /> <br />.., <br /> <br />. <br /> <br />. <br /> <br />r1 <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />..., <br />. <br /> <br />II <br /> <br />. <br /> <br />.., <br />. <br /> <br />devices. <br /> <br />1"'"1 <br /> <br />5. Recent NRMCA, VMMB or Department inspection records certifying the <br />plant or truck can produce concrete and documentation showing that action has been <br />taken to correct deficiencies noted during the inspections. <br /> <br />. <br /> <br />r"'1 <br /> <br />09/09 <br /> <br />01 000-11 0 <br /> <br />03-4122.F <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.