Laserfiche WebLink
<br />..., <br /> <br />. <br /> <br />.., <br />. <br /> <br />..., <br /> <br />. <br /> <br />.., <br />. <br /> <br />I., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />,.., <br />. <br /> <br />r-, <br />. <br /> <br />., <br />. <br /> <br />P'1 <br />. <br /> <br />..., <br /> <br />. <br /> <br />M <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />r, <br /> <br />. <br /> <br />., <br />. <br /> <br />,.., <br /> <br />. <br /> <br />..., <br /> <br />560-11.6 Protection of Adjacent Surfaces: Protect all surfaces and working <br />mechanisms not intended to be coated, during the application of coatings. Clean surfaces <br />that have been contaminated with coatings until all traces of the coating has been <br />removed. Do not allow material from cleaning and coating operations to be dispersed <br />outside the work site. <br />560-11.7 Inaccessible Surfaces: Coat all surfaces that will become inaccessible <br />after fabrication, erection, or installation. <br />560-11.8 Sealing/Caulking: Completely seal the perimeter of all faying surfaces, <br />cracks and crevices, joints open less than 1/2 inch [13 mm], and skip-welded joints. Apply <br />the sealant to the joint following the coating manufacturer's recommendations. Ensure the <br />sealant/caulking bead has a smooth and uniform finish and is cured according to the <br />sealant manufacturer recommendation prior to the overcoat application. <br />560-11.9 Thickness of Coats: Apply coatings to the thickness as identified by the <br />manufacturer's technical data requirements. Do not allow any portion of the coating films <br />to be less than the specified minimum film thicknesses. Ensure that the total minimum film <br />thickness for any combination of coats equals the sum total of the averages of the <br />specified thickness range of the individual coats. Achieve the total minimum film thickness <br />before the application of the finish coat. <br />After application of each coat of coating, thoroughly inspect the surfaces. <br />Take film thickness in accordance with SSPC -PA2. When the film thickness is deficient <br />correct the deficiency in accordance with manufacturer's recommendations to achieve the <br />appropriate thickness and retest the area. Inspect the finish and DFT of each applied <br />coating for compliance prior to the application of successive coats. <br />560-11.10 Coating Drying, and Curing: Follow the coating manufacturer's <br />recommended drying and curing times for handling, recoating, and top coating. Meet the <br />coating manufacturer's technical data requirements for testing the coating for proper <br />curing before handling and shipping. Meet the requirements of ASTM D 4752, when the <br />manufacturer's technical data sheet does not have a specified cure test. <br />Verify the final cure of water-based coatings in accordance with <br />ASTM D 4752, but water must be substituted as the solvent. <br />560-11.11 Coating Finish: Apply each coat free of runs, sags, blisters, bubbles, and <br />mud cracking; variations in color, gloss, or texture; holidays, excessive film buildup, foreign <br />contaminants and dry overspray. Ensure each coat of applied material is clean, dry, cured, <br />and free of surface contaminants prior to the application of the next successive coat. <br />Check for missed areas or pinholes in accordance with manufacturer's recommendations. <br />On rough or pitted surfaces, it may be necessary to apply a film thickness in excess of the <br />normal manufacturer recommended coating thickness to obtain acceptable coverage. <br />560-11.12 Coating Welded Areas: After cleaning the area, apply primer to achieve <br />a DFT per manufacturer's recommendations. <br /> <br />560-12 Sequence of Coating. <br />560-12.1 Shop Coating: Perform all work in an area capable of protecting the steel <br />and applied coating from wind, weather, dust and direct sunlight. Ensure that all coated <br />surfaces are protected from damage. Repair all damaged coatings in accordance with <br />SSPC-PA 1 and/or the coating manufacturer's recommendations. Repairs to the topcoat <br />must result in an acceptable, uniform gloss and color for visible surfaces. The Engineer will <br />have final authority concerning the coating's uniformity and acceptable appearance. Handle <br />steel members with care to minimize damage to or contamination of the coating. <br /> <br />09/09 <br /> <br />01000-133 <br /> <br />03-4122.F <br />