My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..., <br /> <br />. <br /> <br />n <br /> <br />.., <br /> <br />structural steel appears to be defective during the cleaning operation, notify the Engineer <br />immediately. After repairs are completed, clean and coat the repaired sections per this <br />Specification. <br />Cover all motors, gears and electrical apparatus not to be coated and may be <br />damaged by surface preparations. Ensure all bridge components are kept free of abrasive <br />materials buildup at all times. <br />560-15.2 Testing of Original Coating: When sound portions of the original coating <br />are to be left in place, prior to the commencement of cleaning and coating operations, <br />apply a test patch (minimum area of 100 ft2 [9.3 m2]) of the proposed coating system in <br />accordance with this Specification and have it evaluated by the Engineer for approval. <br />Allow the test patch to cure a minimum of 7 days prior to evaluation. Ensure <br />the test patch meets all Specification requirements and also exhibit a minimum adhesion <br />rating of 4A when tested in accordance with ASTM D 3359. Repair damage, which occurs <br />as a result of testing in accordance with this Specification. <br />560-15.3 Application of Coating: Apply an overall coating system to all surface in <br />accordance with the manufacturers recommendations and the Contract Documents. <br /> <br />. <br /> <br />. <br /> <br />r'1 <br />. <br /> <br />..., <br />. <br /> <br />..., <br />. <br /> <br />,.., <br />. <br /> <br />., <br /> <br />560-16 Lead Abatement. <br />560-16.1 Coating Hazardous Material Analysis: When the Contract includes <br />removal of paint from an existing structure the Coating Hazardous Material Analysis Data <br />Sheet will be available on the Department's web site. The URL for obtaining this <br />information is: <br />http://www.dot.state.fl.us/statematerialsoffice/laboratory / chemical/hazardouscoati ngs/inde <br />x.htm. <br />560-16.2 General: Establish a hazardous coating removal program to document and <br />control coating removal and application operations in strict compliance with OSHA 29CFR <br />Part 1910.1025, 1926.62, and 1926.63. This program will include applicable requirements <br />from Environmental Protection Agency (EPA) environmental protection issues and <br />hazardous waste disposal. <br />Prior to construction of the containment area or removing any hazardous <br />materials perform Total Suspended Particulate (TSP) sampling and testing of the air and <br />soil for any hazardous materials. Document the number and specific location where each <br />sample is taken as outlined in Project Design - Industrial Lead Paint Removal Handbook, <br />Volume 2 and use these results to determine a baseline level of any hazardous materials on <br />the job site. Continue the TSP monitoring from the beginning of work to the removal of the <br />containment devices. <br />Workday determination constitutes only the time during which cleaning and <br />surface preparation and subsequent clean up is performed. Enter all pertinent information <br />into a field logbook. For the purposes of computing action levels, the workday must not <br />exceed 8 hours. <br />560-16.3 Pollution Control: Submit a written pollution control and monitoring plan <br />at the preconstruction meeting which clearly describes the means for complying with all <br />Local, State and federal regulations including pollution control provisions specified herein. <br />The written plan must be in accordance with Project Design: Industrial Lead Paint Removal <br />Handbook, Volume II, Phase 6, Environmental Monitoring and Phase 7, Worker Protection <br />and specifically include, but not be limited to, providing a scaled map of the work site <br />layout showing the proposed number and location of soil and sediment sampling, waste <br /> <br />I' <br /> <br />. <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />..." <br />. <br /> <br />,..., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />r'1 <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />I' <br /> <br />. <br /> <br />.. 1 <br /> <br />09/09 <br /> <br />01 000-1 35 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.