Laserfiche WebLink
<br />..., <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />560-16.12 Waste Identification: Collect samples in accordance with U.S. <br />Environmental Protection Agency - SW-846, Test Methods for Evaluating Solid Waste - <br />Physical/Chemical Methods. Use a random and representative sampling technique. Collect <br />a minimum of four representative samples of each waste stream. These waste streams <br />include, but are not limited to, paint chips, dust, and paint chips mixed with disposable <br />abrasives and debris. Complete the initial sampling of each waste stream immediately upon <br />filling the first drum, but do not allow waste to accumulate for longer than 7 days before <br />sampling. <br />After the representative samples are collected, send them immediately to the <br />EPA certified laboratory for analysis. Unless otherwise directed by the Engineer, required <br />by State regulations, or required by the waste recycling or disposal facility, once each <br />waste stream is sampled, tested, and classified, additional sampling and analysis are not <br />required for subsequent shipments unless the waste stream changes. Submit samples to <br />an approved laboratory to be tested for arsenic, barium, cadmium, chromium, lead, <br />mercury, selenium and silver in accordance with EPA Methods 3050 and 6010 (content) <br />and EPA Method 1311, Toxicity Characteristics Leaching Procedures (TCLP).Clearly label <br />each sample with sample number, date and time of sampling, name of collector, and <br />location of collection. <br />Maintain chain of custody forms for each sample. Enter each sample on a <br />sample analysis request form. Enter sample numbers, type of waste, amount of each <br />sample, distribution of samples, signature and all other information into field logbook. <br />560-16.13 Waste Storage: Collect waste from the control devices, equipment, and <br />all work surfaces on a daily basis. Keep hazardous and non-hazardous waste separate. Do <br />not mix blasting debris with any other type of waste. Place waste in approved storage <br />drums. <br />Locate all hazardous waste within a regulated area. The maximum weight for <br />each drum, when filled, is 821 pounds [372 kg]. Properly seal and label all drums. <br />Transport waste storage drums to a secured, marked, temporary storage area. Locate the <br />temporary storage area on well-drained ground not susceptible to flooding or storm water <br />run-off. Place drums on pallet and cover with fiber reinforced, impermeable tarpaulins. <br />Store drums no more than two drums wide and two drums high. Arrange drums so that <br />labels are easily readable. Do not store waste in the temporary storage area longer than 90 <br />days. <br />560-16.14 Waste Disposal: Dispose of all non-hazardous waste. The Department is <br />responsible for the transportation, treatment and disposal of hazardous waste. Coordinate <br />disposal of hazardous waste with the Engineer, a minimum of three weeks prior to the date <br />of off-site shipment of waste. <br /> <br />. <br /> <br />" <br />. <br /> <br />,., <br />. <br /> <br />,., <br />. <br /> <br />.., <br />. <br /> <br />, <br />. <br /> <br />1""'1 <br />. <br /> <br />r'I <br />. <br /> <br />II <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br /> <br />r"'1 <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />II <br /> <br />560-17 Method of Measurement. <br />The quantities to be paid for will be determined under one of the following <br />conditions: <br />(a) When no pay item for coating structural steel is included in the proposal, <br />the work specified in this Section will not be paid for directly but will be considered as <br />subsidiary work pertaining to the various items of construction on which coating is applied. <br />(b) When a pay item for coating structural steel is included in the proposal, <br />the work specified under this Section will be paid for at the Contract lump sum price, or <br />the Contract price per ton [metric ton], for Coating Structural Steel. The quantity will be <br /> <br />II <br /> <br />. <br /> <br />. <br /> <br />n <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />. , <br /> <br />09/09 <br /> <br />01000-138 <br /> <br />03-4122.F <br /> <br />. <br />