|
<br />...,
<br />
<br />.
<br />
<br />,..,
<br />
<br />.
<br />
<br />560-16.12 Waste Identification: Collect samples in accordance with U.S.
<br />Environmental Protection Agency - SW-846, Test Methods for Evaluating Solid Waste -
<br />Physical/Chemical Methods. Use a random and representative sampling technique. Collect
<br />a minimum of four representative samples of each waste stream. These waste streams
<br />include, but are not limited to, paint chips, dust, and paint chips mixed with disposable
<br />abrasives and debris. Complete the initial sampling of each waste stream immediately upon
<br />filling the first drum, but do not allow waste to accumulate for longer than 7 days before
<br />sampling.
<br />After the representative samples are collected, send them immediately to the
<br />EPA certified laboratory for analysis. Unless otherwise directed by the Engineer, required
<br />by State regulations, or required by the waste recycling or disposal facility, once each
<br />waste stream is sampled, tested, and classified, additional sampling and analysis are not
<br />required for subsequent shipments unless the waste stream changes. Submit samples to
<br />an approved laboratory to be tested for arsenic, barium, cadmium, chromium, lead,
<br />mercury, selenium and silver in accordance with EPA Methods 3050 and 6010 (content)
<br />and EPA Method 1311, Toxicity Characteristics Leaching Procedures (TCLP).Clearly label
<br />each sample with sample number, date and time of sampling, name of collector, and
<br />location of collection.
<br />Maintain chain of custody forms for each sample. Enter each sample on a
<br />sample analysis request form. Enter sample numbers, type of waste, amount of each
<br />sample, distribution of samples, signature and all other information into field logbook.
<br />560-16.13 Waste Storage: Collect waste from the control devices, equipment, and
<br />all work surfaces on a daily basis. Keep hazardous and non-hazardous waste separate. Do
<br />not mix blasting debris with any other type of waste. Place waste in approved storage
<br />drums.
<br />Locate all hazardous waste within a regulated area. The maximum weight for
<br />each drum, when filled, is 821 pounds [372 kg]. Properly seal and label all drums.
<br />Transport waste storage drums to a secured, marked, temporary storage area. Locate the
<br />temporary storage area on well-drained ground not susceptible to flooding or storm water
<br />run-off. Place drums on pallet and cover with fiber reinforced, impermeable tarpaulins.
<br />Store drums no more than two drums wide and two drums high. Arrange drums so that
<br />labels are easily readable. Do not store waste in the temporary storage area longer than 90
<br />days.
<br />560-16.14 Waste Disposal: Dispose of all non-hazardous waste. The Department is
<br />responsible for the transportation, treatment and disposal of hazardous waste. Coordinate
<br />disposal of hazardous waste with the Engineer, a minimum of three weeks prior to the date
<br />of off-site shipment of waste.
<br />
<br />.
<br />
<br />"
<br />.
<br />
<br />,.,
<br />.
<br />
<br />,.,
<br />.
<br />
<br />..,
<br />.
<br />
<br />,
<br />.
<br />
<br />1""'1
<br />.
<br />
<br />r'I
<br />.
<br />
<br />II
<br />
<br />.
<br />
<br />..,
<br />
<br />.
<br />
<br />..,
<br />
<br />r"'1
<br />
<br />.
<br />
<br />,..,
<br />
<br />.
<br />
<br />II
<br />
<br />560-17 Method of Measurement.
<br />The quantities to be paid for will be determined under one of the following
<br />conditions:
<br />(a) When no pay item for coating structural steel is included in the proposal,
<br />the work specified in this Section will not be paid for directly but will be considered as
<br />subsidiary work pertaining to the various items of construction on which coating is applied.
<br />(b) When a pay item for coating structural steel is included in the proposal,
<br />the work specified under this Section will be paid for at the Contract lump sum price, or
<br />the Contract price per ton [metric ton], for Coating Structural Steel. The quantity will be
<br />
<br />II
<br />
<br />.
<br />
<br />.
<br />
<br />n
<br />
<br />.
<br />
<br />..,
<br />
<br />.
<br />
<br />. ,
<br />
<br />09/09
<br />
<br />01000-138
<br />
<br />03-4122.F
<br />
<br />.
<br />
|