Laserfiche WebLink
<br />------- ------- <br /> <br />.., <br /> <br />. <br /> <br />" <br /> <br />. <br /> <br />580-6 Method of Measurement. <br />The quantities to be paid will be the items shown In the Contract Documents, <br />completed and accepted. <br /> <br />..., <br /> <br />. <br /> <br />580- 7 Basis of Payment. <br />..., Prices and payments will be full compensation for all work and materials specified in <br />. this Section. <br /> <br />.., <br /> <br />. <br /> <br />611 ACCEPTANCE OF SIGNAL INSTALLATIONS -SUBMITTAL REQUIREMENTS. <br />(REV 1-14-03) (FA 3-22-04) (1-05) <br /> <br />" <br /> <br />. <br /> <br />SUBARTICLE 611-2.3.1 (Page 680) is deleted and the following substituted: <br /> <br />..., <br />. <br /> <br />. <br /> <br />611-2.3.1 Submittal Requirements: Submit three sets of as-built plans for <br />review by the Engineer on reproductions of the original 11 by 17 inch sheets. Record all <br />as-built information using block lettering or typed text to ensure legibility. Signing and <br />pavement marking plan sheets may be used instead of signalization plan sheets, if a <br />substantial number of changes from the original signalization plans must be recorded. If, in <br />the opinion of the Engineer, the changes can not be clearly delineated on reproductions of <br />the original 11 by 17 inch sheets, clearly delineate all changes on 11 x 17 inch detail <br />sheets, enlarged 200% from the reproductions. Make any corrections resulting from the <br />Engineer's review, and resubmit three sets of the completed as-built plans as a condition <br />precedent to acceptance of the installation. <br /> <br />I' <br /> <br />II <br /> <br />. <br /> <br />.., <br />. <br /> <br />II <br /> <br />. <br /> <br />.., <br /> <br />620 SIGNAL INSTAllATION GROUNDING. <br />(REV 7-12-01) (FA 1-3-02) (1-04) <br /> <br />. <br /> <br />1""1 <br /> <br />SUBARTICLE 620-3.1 (Page 685). The first paragraph is deleted and the following <br />substituted: <br /> <br />. <br /> <br />620-3.1 General: Meet all local electrical codes which exceed these Specifications. <br />Install all grounding conductors, which bond grounding electrode assemblies, 18 inches <br />[450 mm] below finished grade. Accomplish grounding for any element of a traffic signal <br />installation by installing either a grounding electrode assembly or a grounding electrode <br />array, unless otherwise specified in the Contract Documents. <br />Use solid No.6 AWG copper insulated (green) conductor for electrical or <br />lightning protection ground from the system ground bus or barrier plate(s) to the grounding <br />electrodes and from grounding electrode to grounding electrode. Use either solid or <br />stranded No.6 AWG copper insulated (green) conductor for all other applications. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />...., <br /> <br />. <br /> <br />r, <br /> <br />. <br /> <br />rj <br /> <br />. <br /> <br />.., <br /> <br />09/09 <br /> <br />01000-145 <br /> <br />03-4122.F <br /> <br />. <br />