Laserfiche WebLink
<br />r"'I <br /> <br />. <br /> <br />r'I <br /> <br />. SUBARTICLE 630-4.2 (Page 690) is deleted and the following substituted: <br /> <br />.., 630-4.2 Furnish and Install: The Contract unit price per foot [meter] of <br />. conduit, furnished and installed, will include furnishing all hardware and materials as <br />specified in the Contract Documents, and all labor, trenching, backfilling, and restoration <br />., materials necessary for a complete and accepted installation. <br />. Payment for conduit placed in the ground or used on bridge decks will <br />be based on the horizontal path of the installed conduit as measured in a straight line <br />,., between the centers of pull boxes, cabinets, poles, etc. No allowance will be made for <br />. sweeps or vertical distances above or below the ground or the bridge deck. <br />Due to conditions which may exist on the project site, the Contractor <br />11 may furnish conduit in variable lengths. <br />. Furnishing and installing the locate wire is included in the cost of the <br /> <br />conduit. <br /> <br />" <br />. <br /> <br />Conduit used for fiber optic cable includes the cost of furnishing and <br />installing the locate wire and the cost of conducting the continuity test and the insulation <br />resistance test. <br /> <br />.., <br />. <br /> <br />SUBARTIClE 630-4.4 (Page 690) is deleted and the following substituted: <br /> <br />..., <br /> <br />630-4.4 Install: The Contract unit price per foot [meter] of conduit, installed, will <br />include all miscellaneous hardware and materials, labor, trenching, backfilling, and <br />restoration materials necessary for a complete and accepted installation. <br />The Engineer will supply conduit in sections with one coupling per section <br />and elbows as required. <br />Payment for conduit placed in the ground or used on bridge decks will be <br />based on the horizontal path of the installed conduit as measured in a straight line between <br />the centers of pull boxes, cabinets, poles, etc. No allowance will be made for sweeps or <br />vertical distances above or below the ground or the bridge deck. <br />Installing the locate wire is included in the cost of the conduit. Conduit used <br />for fiber optic cable includes the cost of installing the locate wire and the cost of <br />conducting the continuity test and the insulation resistance test. <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />.., <br />. <br /> <br />..., <br /> <br />. <br /> <br />F"1 <br /> <br />- <br /> <br />641 PRESTRESSED CONCRETE POLES. <br />(REV 2-24-04) (FA 3-22-04) (1-05) <br /> <br />..., <br /> <br />. <br /> <br />SECTION 641 (Pages 702-703) is deleted and the following substituted: <br /> <br />n <br /> <br />. <br /> <br />SECTION <br />PRESTRESSED CONCRETE POLES <br /> <br />641 <br /> <br />.., <br /> <br />641-1 Description. <br />Furnish and install prestressed concrete poles for service pole applications <br />(Type N-II), luminaire support (Type N-III), and strain poles for span wire support of traffic <br />signals, signs, and other devices (multiple types). Obtain precast, prestressed concrete <br />poles from a manufacturing plant that is currently on the Department's list of qualified <br /> <br />. <br /> <br />1"'"1 <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />..., <br /> <br />09/09 <br /> <br />01 000-1 47 <br /> <br />03-4122.F <br /> <br />. <br />