My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.... <br /> <br />. <br /> <br />-. <br /> <br />damage. Make repairs according to the manufacturer's recommendations and to the <br />satisfaction of the Engineer. Ensure that completed repairs provide a level of quality <br />necessary to maintain the service life warranty of the sign and are satisfactory in <br />appearance to the Engineer. <br /> <br />. <br /> <br />..., <br />. <br /> <br />,., <br /> <br />700-7 Footings for Signs, Posts and Supports. <br />700-7.1 Excavation and Backfilling: Perform excavation and backfilling for the <br />footings in accordance with Section 125, with the exceptions that no specific density is <br />required and that the backfill may be tamped in 4 inches [100 mm] maximum layers. Use <br />material that is at near optimum moisture and neither dry or saturated, and tamp to the <br />extent directed by the Engineer. The Department may require that the backfilling be done <br />with poured concrete. <br />Install spread footings which support sign structures overhanging the <br />roadway as required in 455-25 through 455-37. <br />700-7.2 Mixing and Placing Concrete: For batching and mixing of concrete for <br />footings, meet the requirements of Section 346, except that the Engineer will allow hand <br />mixing by approved methods where the quantity to be mixed does not exceed 1/2 yd3 <br />[0.4 m3]. Use cast-in-place or precast concrete for the footings. <br />700-7.3 Forms: The Engineer will not require forms when the ground is sufficiently <br />firm, in which case, sufficiently moisten the adjacent earth to prevent it from absorbing the <br />moisture from the concrete. Where forms are required and the soil is not moist, place <br />sufficient water, as directed by the Engineer, in the hole, and pour the concrete as soon as <br />the water has been absorbed. Place at least 4 inches [100 mm] of loose earth, free from <br />clods or gravel, over the top of the footing to effect curing. <br />700-7.4 Finishing Concrete: Trowel the top of the concrete to a smooth finish. <br />700-7.5 Removal of Footing: When the plans call for existing ground-mounted signs <br />to be modified or removed, immediately remove supports and footings that project more <br />than 6 inches [150 mm] above the ground surface after removing the sign panel from the <br />assembly. Remove existing footings to a depth at least 12 inches [300 mm] below the <br />ground surface. The costs will be included in the Contract unit price of the item to which it <br />is incidental. <br /> <br />" <br /> <br />. <br /> <br />..., <br />. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />,., <br />. <br /> <br />,.., <br /> <br />. <br /> <br />" <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />700-8 Erection of Signs and Sign Supports. <br />Do not erect overhead sign supports until the concrete in the support footing has <br />cured for at least seven days. The Engineer may allow sign support erections prior to seven <br />days provided the footing concrete strength is at least 2,500 psi [17 MPa]. Determine <br />concrete strength from tests on a minimum of two test cylinders, tested in accordance <br />with Section 346. <br />Erect the signs and sign structures in accordance with the details shown in the <br />plans. The Contractor may fabricate the structural steel sign trusses in sections that will fit <br />into available galvanizing vats. Prior to galvanizing, weld the joints as specified in 460-6 <br />and in accordance with the details shown in the plans. Metalize damaged parts as specified <br />in Section 562. <br />Weld aluminum structures in accordance with 965-3. <br /> <br />II <br /> <br />r-"I <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />I' <br /> <br />. <br /> <br />" <br /> <br />700- 9 Method of Measurement. <br />The quantities to be paid for will be: <br /> <br />. <br /> <br />r-, <br />. <br /> <br />09/09 <br /> <br />01000-155 <br /> <br />03-4122.F <br /> <br />..., <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.