My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..... <br /> <br />. <br /> <br />~ <br /> <br />. <br /> <br />Longitudinal <br />Profile* <br /> <br />The failure time must be <br />Single Test: <br />Test temperature 800C dequal or greater than the <br />. an5calculated value using the <br />applied stress of 650 pSI.; ~hree constants from the <br />replicates <br />~hree points test <br />!rest temperature 800C and <br />applied stresses of 650 and Calculate three constants <br />450 psi. Failure time at 500 psi at <br />Test temperature 700C at230C ~ 100 years (95% <br />applied stress of 650 psi; 5statistical confidence) <br />Procedure C . <br />and FM 5_573replicates at each stress level <br /> <br />ASTM 2837 <br /> <br />FM 5-572, <br /> <br />- <br /> <br />II <br /> <br />. <br /> <br />~ <br /> <br />. <br /> <br />., <br /> <br />,.., <br /> <br />The failure time must be <br />Single Test: Test temperature equal or greater than the <br />800C and applied stress of 650calculated value using the <br />psi.; 5 replicates ~hree constants from thE <br />~hree points test <br /> <br />II <br />. <br /> <br />. <br /> <br />" <br /> <br />Oxidation Resistance of Pipes <br />Pipe Location Irest Method /Test Conditions Requirement <br />OIT Test . <br />Liner and/or (ASTM D2 replicates (to determine 25. . . <br />minutes, minimum <br />Crown 3895) initial OIT value) <br /> <br />Incubation Three samples for incubation A of 3 ::t 1 . <br />Liner and/or~estFM5-5740f 195 days at 800C and(veragle hllb Imlnuhtes <br />. . no va ue s a e ess t an <br />Crown and OIT test applied stress of 250 pSI. One 2' ) <br />minutes <br />ASTM D 38950lT test per each sample. <br />Note: FM = Florida Method of Test. <br />* Required only when corrugation resin is different than liner resin. <br />* A higher test temperature (900C) may be used if supporting test data acceptable to the <br />State Materials Engineer is submitted and approved in writing. <br /> <br />...., <br /> <br />. <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />.... <br /> <br />. <br /> <br />,... <br /> <br />, <br /> <br />948-2.3.3 Certification: Furnish to the Engineer certification from the <br />manufacturer for each pipe diameter to be incorporated into the project that the pipe meets <br />the requirements of these Specifications. <br />Manufacturers seeking evaluation of a product in accordance with <br />Departmental procedures must submit test reports conducted by a laboratory deemed to be <br />appropriately qualified by the Plastics Pipe Institute and acceptable to the State Materials <br />Engineer. Submit this information to the Director, State Materials Office. <br /> <br />. <br /> <br />- <br /> <br />.., <br /> <br />. <br /> <br />,... <br /> <br />SUBARTICLE 948-4.4 (Page 861) is expanded by the following: <br /> <br />. <br /> <br />II <br /> <br />948-4.4.1 Machine Spiral Wound Pipe Liner: Machine spiral wound pipe finer <br />shall consist of a continuous one piece profile strip wound directly into the deteriorated <br />pipelines. The liner can be installed in close fit to the host pipe, or alternatively installed at <br />a fixed diameter. Where the liner is installed at a fixed diameter, the annular space <br />between the spiral wound liner pipe and the existing pipe is grouted. <br />(1) Polyvinyl Chloride: Polyvinyl chloride machine spiral wound pipe <br />liner shall meet the requirements of ASTM F 1697 and shall have a minimum cell <br />classification of 13354. <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />""" <br /> <br />. <br /> <br />...., <br /> <br />09/09 <br /> <br />01000-183 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.