My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.., <br /> <br />- <br /> <br />..., <br /> <br />..., <br /> <br />minimum of 2.50 Ib/ft3 [40.1 kg/m3] of CCA oxides shall be retained in the outer 0.60 inch <br />[15.2 mm]. <br />All guardrail material (timber posts, blocks, wedges, etc.) shall retain a <br />minimum of 0.40 Ib/ft3 [6.4 kg/m3] of CCA or ACQ-D or CA-B at 0.21 Ib/ft3 [3.3 kg/m3] in <br />the outer 1 inch [25 mm] zone. <br />955-5.3 Posts: Round/sawn timber fence posts shall retain a minimum of 0.40 Ib/ft3 <br />[6.4 kg/m3] of ACQ-D or 0.21 Ib/f3 [3.3 kg/m3]of CA-B in the outer 1 inch [25 mm] zone. <br />955-5.4 Determination of Retention: Retention shall be determined by assay <br />performed and certified by the treating company in accordance with the applicable AWPA <br />standards. <br /> <br />. <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />...., <br /> <br />. <br /> <br />-, <br /> <br />955-6 Penetration Requirements. <br />955-6.1 For Structural Timber: The penetration of the treatment shall be in <br />accordance with the applicable AWPA standards, with the exceptions as specified herein. <br />955-6.2 For Round Piles and Fence Posts: Any round pile or post, which does not <br />show complete sapwood penetration will be rejected or shall be retreated to meet such <br />penetration requirement. <br />955-6.3 Retreatment: The necessity for retreatment of structural timber, piling and <br />posts shall be avoided as far as practicable and if it becomes apparent that due measures <br />are not being taken to prevent such necessity, the acceptance of retreated materials may <br />be withdrawn. <br />When retreatment is necessary the maximum limits for temperature of steam <br />or preservative, and for preservative pressure, which apply to the original treatment shall <br />not be exceeded during the retreatment. <br />955-6.4 Determination of Penetration: Sapwood penetration shall be determined by <br />taking at least one increment boring core from each pile and cap, and other pieces of <br />similar dimensions and, for other sizes of material, at least one boring from the charge for <br />each 1,000 FBM [2 m3] in the charge. All bored holes shall be immediately plugged, with <br />tight fitting treated plugs. <br /> <br />. <br /> <br />-. <br /> <br />. <br /> <br />.., <br />. <br /> <br />..., <br /> <br />. <br /> <br />., <br />. <br /> <br />..., <br /> <br />. <br /> <br />....., <br /> <br />955-7 Handling Salt Treated Piling. <br />In handling of piles that have been treated with chromated copper arsenate or <br />ammoniacal copper arsenate, cable slings shall be used. Mechanical grabbers or pointed <br />tools shall not be permitted. Rough or careless handing shall be avoided at all times. <br /> <br />. <br /> <br />..... <br /> <br />. <br /> <br />..... <br /> <br />955-8 Identification of Treating Plants for Round Piling. <br />The treating plant shall brand, or place a distinctive permanent mark, on each round <br />pile, approximately 6 feet [2 m] from the butt end, such that the plant responsible for the <br />treatment can be readily determined at any time during the service life of the piling. <br /> <br />. <br /> <br />...., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />I' <br /> <br />. <br /> <br />,..., <br /> <br />. <br /> <br />..., <br /> <br />09/09 <br /> <br />01000-185 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.