My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />M <br /> <br />. <br /> <br />fl <br />. <br /> <br />- <br /> <br />registered Professional Engineers with a minimum of 10 years supervisory experience each <br />in movable bridge construction. Ensure the Engineers have working knowledge of the <br />movable bridge leaf motion control techniques, mechanical equipment and arrangements <br />specified for this project. Ensure that each Engineer has been in responsible control of the <br />design and implementation of at least three movable bridge electrical control and <br />machinery systems within the past 10 years of which, at least one of the three bridges <br />was within the last three years. Ensure that a minimum of one of the three bridge designs <br />incorporated the same type of leaf motion control and machinery systems specified for this <br />project. <br />105-5.8.6 Concrete Post-Tensioned Other Than Segmental Box Girder <br />Construction: Ensure the individual filling the following positions meet the minimum <br />requirements as follows: <br />105-5.8.6.1 Project Engineer: Ensure the Project Engineer is a <br />registered Professional Engineer with five years of bridge construction experience. Ensure <br />that a minimum of three years of experience is in concrete post-tensioned construction. <br />Ensure that the three years of experience includes experience in girder erection, safe use of <br />cranes, stabilization of girders; design of false work for temporary girder support, post- <br />tensioning and grouting operations, and a minimum of one year as the Project Engineer in <br />responsible charge of post-tensioning related engineering responsibilities. <br />105-5.8.6.2 Project Superintendent/Manager: Ensure the Project <br />Superintendent/Manager has a minimum of ten years of bridge construction experience or <br />is a registered Professional Engineer with five years of bridge construction experience and <br />has a minimum of three years of supervisory experience in girder erection, safe use of <br />cranes, stabilization of girders; design of falsework for temporary girder support post- <br />tensioning, grouting operations and a minimum of one year as the Project <br />Superintendent/Manager in responsible charge of post-tensioning related operations. <br />105-5.8.6.3 Foreman: Ensure the Foremen has a minimum of five <br />years of bridge construction experience with two years of experience in post-tensioning <br />related operations and a minimum of one year as the foreman in responsible charge of <br />post-tensioning related operations. <br />105-5.8.7 Post Tensioning: Perform all post-tensioning field operations under <br />the direct supervision of a Level II Qualified Post-Tensioning and Grouting Technician <br />qualified through the Department's Construction Training Qualification Program (CTQP). In <br />addition, provide a minimum of two crewmembers that are CTQP Level I Qualified Post- <br />Tensioning and Grouting Technicians. All personnel involved in grouting must attend a <br />grouting training session provided by the Department not less then seven days prior to the <br />start of the first stressing or grouting operation of the project. <br />Perform all vacuum grouting operations under the direct supervision of <br />a crew foreman who has been trained and has experience in the use of vacuum grouting <br />equipment and procedures. Submit the crew foreman's credentials to the Engineer prior to <br />performing any vacuum grouting operations. <br />Conduct all stressing and grouting operations in the presence of the <br />Engineer. Coordinate and schedule all post-tensioning activities to facilitate inspection by <br />the Engineer. <br />105-5.8.8 Failure to Comply with Bridge Qualification Requirements: Make <br />an immediate effort to reestablish compliance. If an immediate effort is not put forth as <br />determined by the Engineer, payment for the bridge construction operations requiring <br />supervisors to be qualified under this Specification will be withheld up to 60 days. Cease <br /> <br />I <br /> <br />I <br /> <br />.., <br />. <br /> <br />I <br /> <br />fl <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />f'1 <br />. <br /> <br />f""I <br /> <br />. <br /> <br />.., <br />. <br /> <br />I <br /> <br />f'1 <br />. <br /> <br />., <br />. <br /> <br />II <br />. <br /> <br />. <br /> <br />.., <br /> <br />09/09 <br /> <br />01000-26 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.