My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.., <br /> <br />. <br /> <br />,., <br /> <br />Ii <br />. <br /> <br />lTest Name Quality Control Verification <br />Standard Proctor Maximum One per soil type One per soil type <br />Density <br /> One per four LOTs and fo <br />Density One per LOT wet conditions, the first lif <br /> not affected by water <br />Soil Classification One per Standard Proctor One per Standard Proctor <br /> Maximum Density Maximum Density <br /> <br />. <br /> <br />I'j <br />. <br /> <br />f"1 <br />. <br /> <br />1"""1 <br /> <br />120-10.3.2 Test Selection and Reporting: Determine test locations including <br />Stations and offsets, using the random number generator provided by the Engineer. Do not <br />use note pads or work sheets to record data for later transfer to the Density Log Book. <br />Notify the Engineer upon successful completion of Quality Control testing on each LOT. <br />120-10.4 Verification Comparison Criteria and Resolution Procedures: <br />120-10.4.1 Standard Proctor Maximum Density Determination: The Engineer <br />will verify the Quality Control results if the results compare within 4.5 PCF [72 kg/m3] of <br />the Verification test result. Otherwise, the Engineer will take one additional sample of <br />material from the soil type in question. The State Materials Office or an AASHTO <br />accredited laboratory designated by the State Materials Office will perform Resolution <br />testing. The material will be sampled and tested in accordance with AASHTO T 99, <br />Method C. <br />The Engineer will compare the Resolution Test results with the <br />Quality Control test results. If all Resolution Test results are within 4.5 PCF [72 kg/m3] of <br />the corresponding Quality Control test results, the Engineer will use the Quality Control <br />test results for material acceptance purposes for each LOT with that soil type. If the <br />Resolution Test result is not within 4.5 PCF [72 kg/m3] of the Contractor's Quality Control <br />test, the Verification Test result will be used for material acceptance purposes. <br />120-10.4.2 Density Testing: When a Verification or Independent Verification <br />density test fails the Acceptance Criteria, retest the site within a 5 feet (1.5 meter) radius <br />and the following actions will be taken: <br />1. If the Quality Control retest meets the Acceptance Criteria and <br />meets the 120-10.1.1 criteria when compared with the Verification or Independent <br />Verification test, the Engineer will accept those LOTs. <br />2. If the Quality Control retest does not meet the Acceptance Criteria <br />and compares favorably with the Verification or Independent Verification test, rework and <br />retest the LOT. The Engineer will re-verify those LOTs. <br />3. If the Quality Control retest and the Verification or Independent <br />Verification test do not compare favorably, complete a new comparison analysis as defined <br />in 120 10.1.1. Once acceptable comparison is achieved, retest the LOTs. The Engineer will <br />perform new verification testing. Acceptance testing will not begin on a new LOT until the <br />Contractor has a gauge that meets the comparison requirements. <br />Record Quality Control test results in the density log book on <br />approved Department forms provided by the Engineer. Submit the original, completed <br />density log book to the Engineer at final acceptance. <br />120-10.4.3 Soil Classification: The Engineer will verify the Quality Control <br />results if the Verification results identify matching soil classifications. Otherwise, the <br />Engineer will take one additional sample of material from the soil type in question. The <br />State Materials Office or an AASHTO accredited laboratory designated by the State <br /> <br />1""'\ <br />. <br /> <br />1"1 <br />. <br /> <br />., <br />. <br /> <br />n <br />. <br /> <br />,.., <br />. <br /> <br />P1 <br />. <br /> <br />M <br /> <br />. <br /> <br />., <br />. <br /> <br />,., <br />. <br /> <br />,., <br />. <br /> <br />r"1 <br />I <br />. <br /> <br />. <br /> <br />r'1 <br /> <br />. <br /> <br />.., <br /> <br />09/09 <br /> <br />01000-34 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.