My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.., <br />. <br /> <br />,.., <br /> <br />. <br /> <br />ARTICLE 125-9 (Pages 172 and 173) is deleted and the following substituted: <br /> <br />., <br />. <br /> <br />.., <br />I <br /> <br />125-9 Acceptance Program. <br />125-9.1 General Requirements: Meet the requirements of 120-10.1, except replace <br />the requirements of 120-10.2 with 125-9.2 <br />125-9.2 Acceptance Criteria: <br />125-9.2.1 Density: Obtain a minimum Quality Control (QC) density in any <br />LOT of 100% of the Standard Proctor maximum density as determined by AASHTO T 99, <br />Method C, or the requirements of 125-8.3.3.1 when applicable. For metal and plastic pipe, <br />compact the backfill in the cover zone to a density of at least 95 % of the Standard Proctor <br />maximum density as determined by AASHTO T 99, Method C. <br />125-9.2.2 Exceptions to Pipe Density Requirements: Compact the backfill to <br />a firmness approximately equal to that of the soil next to the pipe trench in locations <br />outside the plane described by a two (horizontal) to one (vertical) slope downward from <br />the roadway shoulder line or the back of curb as applicable. Apply 120-9.2.1 when <br />compacting side-drain pipe backfill under driveways serving a property that is not a single <br />residential lot. <br />125-9.3 Additional Requirements: <br />125-9.3.1 Frequency: Conduct QC Standard Proctor maximum density <br />sampling and testing at a minimum frequency of one test per soil type. The Verification <br />test will be at a minimum of one test per soil type: <br /> <br />" <br />. <br /> <br />Il <br />I <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />Irest Name Quality Control Verification <br />Standard Proctor One per soil type One per soil type <br />Maximum Density <br /> One per four LOTs and for <br />Density One per LOT wet conditions, the first lift <br /> not affected by water <br />Soil Classification One per Standard Proctor One per Standard Proctor <br />Maximum density Maximum density <br /> <br />r, <br />. <br /> <br />..., <br /> <br />. <br /> <br />.., <br />iii <br /> <br />ARTICLE 125-10 (Page 173) is deleted and the following substituted: <br /> <br />.., <br /> <br />125-10 Verification Comparison Criteria and Resolution Procedures: <br />125-10.1 Standard Proctor Maximum Density Determination: The Engineer will <br />verify the Quality Control results if the results compare within 04.5 PCF [72 kg/m3] of the <br />Verification test result. Otherwise, the Engineer will take one additional sample of material <br />from the soil type in question. The State Materials Office or an AASHTO accredited <br />laboratory designated by the State Materials Office will perform Resolution testing. The <br />material will be sampled and tested in accordance with AASHTO T 99, Method C. <br />The Engineer will compare the Resolution test result with the Quality Control <br />test results. If the Resolution test result is withinO 4.5 PCF [72 kg/m3] of the corresponding <br />Quality Control test results, the Engineer will use the Quality Control test results for <br />material acceptance purposes for each LOT with that soil type. If the Resolution Test result <br />is not withinO 4.5 PCF [72 kg/m3] of the Contractor's Quality Control test, the Verification <br />Test result will be used for material acceptance purposes. <br /> <br />.., <br /> <br />. <br /> <br />. <br /> <br />n <br />. <br /> <br />,., <br /> <br />. <br /> <br />r1 <br /> <br />. <br /> <br />., <br /> <br />09/09 <br /> <br />01000-36 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.