Laserfiche WebLink
<br />., <br /> <br />. <br /> <br />1'"'1 <br /> <br />. <br /> <br />r"1 <br />. <br /> <br />I <br /> <br />" <br />. <br /> <br />.., <br />. <br /> <br />" <br />. <br /> <br />,., <br />. <br /> <br />'1 <br />. <br /> <br />.., <br />. <br /> <br />.., <br /> <br />. <br /> <br />,., <br />. <br /> <br />..., <br />. <br /> <br />.., <br />. <br /> <br />,., <br />. <br /> <br />,., <br />. <br /> <br />., <br />. <br /> <br />.., <br /> <br />. <br /> <br />...., <br /> <br />. <br /> <br />Irest Name Quality Control Verification <br />Modified Proctor Maximum One per eight consecutive One per 16 consecutive LOTs <br />Density LOTs <br />Density One per LOT One per four LOTs <br />Roadway Surface T en per LOT T"hree per LOT <br />Shoulder/widening* Surface Five per LOT One per LOT <br />Roadway Thickness Three per LOT Three per four LOTs <br />Shoulder/widening * Thickness Three per two consecutivE Three per eight consecutive <br />LOTs LOTs <br />* Note = for widening less than or equal to 6ft [1.5 m] <br /> <br />200-7.3 Additional Requirements: <br />200-7.3.1 Quality Control Testing: <br />200-7.3.1.1 Modified Proctor Maximum Density Requirement: Collect <br />enough material to split and create three separate samples and retain for the Engineer's <br />Verification and Resolution testing until the Engineer accepts the 16 LOTs represented by <br />the samples. <br />200-7.3.1.2 Depth and Surface Testing Requirements: Determine test <br />locations including Stations and Offsets, using the Random Number generator provided by <br />the Department. Enter test results into the Department's database. Perform thickness <br />check on the finished base or granular subbase component of a composite base. Provide <br />traffic control, coring/boring equipment, and an operator for the coring/boring equipment. <br />Traffic control is to be provided in accordance with the standard maintenance of traffic <br />requirements of the Contract. <br />The thickness is considered deficient, if the measured depth is <br />over 1/2 inch [13 mm] less than the specified thickness. Correct all deficient areas of the <br />completed base by scarifying and adding additional base material. As an exception, if <br />authorized by the Department, such areas may be left in place without correction and with <br />no payment. <br />Check the finished surface of the base course with a template <br />cut to the required crown and with a 15 foot [4.572 m] straightedge laid parallel to the <br />centerline of the road. Correct all irregularities greater than 1/4 inch [6 mm] to the <br />satisfaction of the Engineer by scarifying and removing or adding rock as required, and <br />recompact the entire area as specified hereinbefore. <br />200-7.3.1.3 Surface & Thickness Reduced Testing Frequency: When <br />no Resolution testing is required for 12 consecutive verified LOTs, or if required, the QC <br />test data was upheld, reduce the QC surface and/or thickness checks to one half the <br />minimum requirements as stated in 200-7.2.2 (eg. Reduce frequency from ten per LOT to <br />ten per two LOTs) by identifying the substantiating tests and notifying the Engineer in <br />writing prior to starting reduced frequency of testing. If the Verification test fails, and <br />Quality Control test data is not upheld by Resolution testing the Quality Control testing will <br />revert to the original frequency of 200-7.2.2. The results of the Independent Verification <br />testing will not affect the frequency of the Quality Control testing. <br />200-7.3.2 Department V erification Tests: <br />200-7.3.2.1 Maximum Density: The Engineer will randomly select one <br />of the two split samples and test in accordance with FM 1-T 180, Method D. <br />200-7.3.2.2 Thickness and Surface Testing Requirements: the <br />department will verify the Base thickness at the frequency listed in 200-7.2.2. The <br /> <br />09/09 <br /> <br />01000-42 <br /> <br />03-4122.F <br />