My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.., <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />be reduced by 1/2 inch [13 mmJ, and the maximum allowable thickness may be increased <br />1/2 inch [13 mmJ, unless called for differently in the Contract documents. <br /> <br />r"1 <br />. <br /> <br />334-2 Materials. <br />334-2.1 General Requirements: Meet the material requirements specified In <br />Division III. Specific references are as follows: <br />Superpave PG Asphalt Binder or Recycling Agent 916-1, 916-2 <br />Coarse Aggregate .............................................Section 901 <br />Fine Aggregate ... ........... ............ ....... ....... ...... ... Section 902 <br />334-2.2 Superpave Asphalt Binder: Unless specified otherwise in the Contract, use <br />a PG 67-22 asphalt binder with the following exceptions: for Traffic Level D, use a <br />PG 76-22 asphalt binder in the final structural layer; for Traffic Level E, use a PG 76-22 <br />asphalt binder in the top two structural layers. In addition, meet the requirements of <br />334-2.3. <br />334-2.3 Reclaimed Asphalt Pavement (RAP) Material: <br />334-2.3.1 General requirements: RAP may be used as a component of the <br />asphalt mixture subject to the following requirements: <br />1. For Traffic Levels A, Band C mixtures, limit the amount of RAP <br />material used in the mix to a maximum of 50 percent by weight of total aggregate. For <br />Traffic Levels D and E mixtures, limit the amount of RAP material used in the mix to a <br />maximum of 30 percent by weight of total aggregate. <br />2. When using a PG 76-22 Asphalt Binder, limit the amount of RAP <br />material used in the mix to a maximum of 15 percent by weight of total aggregate. <br />3. Assume full responsibility for the design, production and <br />construction of asphalt mixes which incorporate RAP as a component material. <br />4. Use RAP from an FDOT approved stockpile or RAP that has an <br />FDOT furnished Pavement Composition Data Sheet. <br />5. Do not use RAP material in any friction course mixes. <br />6. Provide stockpiled RAP material that is reasonably consistent in <br />characteristics and contains no aggregate particles which are soft or conglomerates of <br />fines. <br />7. Provide RAP material having a minimum average asphalt content of <br />4.0 percent by weight of total mix. The Engineer may sample the stockpile to verify that <br />this requirement is met. <br />334-2.3.2 Material Characterization: Assume responsibility for establishing <br />the asphalt binder content, gradation, viscosity and bulk specific gravity (Gsb) of the RAP <br />material based on a representative sampling of the material. Obtain the samples by one of <br />the following methods: <br />1. Roadway cores: Cut a minimum number of cores to be <br />representative of the pavement prior to milling. Fill the core holes prior to opening to <br />traffic. Assume responsibility for accounting for the degradation that will occur during the <br />milling operation. <br />2. Milling: Obtain representative samples by milling the existing <br />pavement to the full depth shown on the plans for a minimum length of approximately <br />200 feet [60 m]. If required to maintain traffic, immediately replace the pavement removed <br />with the mix specified in the Contract. This mix will be paid for at the Contract unit price. <br />3. Stockpile sampling: Obtain samples from a stockpile of either <br />milled or processed RAP. Take representative samples at random locations around the <br /> <br />" <br />. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />, <br />. <br /> <br />,.., <br /> <br />I <br />. <br /> <br />r--, <br />. <br /> <br />.., <br />. <br /> <br />..., <br /> <br />. <br /> <br />,., <br />. <br /> <br />.., <br />. <br /> <br />,., <br />. <br /> <br />,., <br />. <br /> <br />., <br /> <br />. <br /> <br />" <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />n <br /> <br />09/09 <br /> <br />01000-54 <br /> <br />03-4122.F <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.