My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r"l <br /> <br />. <br /> <br />.., <br />. <br /> <br />334-3.3 Mix Design Revisions: During production, the Contractor may request a <br />target value revision to a mix design, subject to meeting the following requirements: (1) <br />the target change falls within the limits defined in Table 334-3, (2) appropriate data exists <br />demonstrating that the mix complies with production air voids specification criteria, and (3) <br />the mixture gradation meets the basic gradation requirements defined in 334-3.2.2. <br /> <br />r'1 <br /> <br />. <br /> <br />,., <br /> <br />. <br /> <br />Table 334-3 <br />Limits for Potential Adjustments to Mix Design Target Values <br />Characteristic Limit from Original Mix Design <br />No.8 sieve [2.36 mm] and Coarser :t 5.0 percent <br />No. 16 sieve [1.18 mm] :t 4.0 percent <br />No. 30 sieve [600jim] :t 4.0 percent <br />No. 50 sieve [300jim] :t 3.0 percent <br />No. 100 sieve [150jim] :!: 3.0 percent <br />No. 200 sieve [75 Jim] :!: 1.0 percent <br />Asphalt Binder Content (1) :!: 0.3 percent <br />(1 ) Reductions to the asphalt binder content will not be permitted if the VMA during <br />production is lower than 1.0 percent below the design criteria. <br /> <br />I' <br /> <br />. <br /> <br />" <br />. <br /> <br />,.., <br />. <br /> <br />11 <br />. <br /> <br />,., <br />. <br /> <br />Submit all requests for reVISions to mix designs, along with supporting <br />documentation, to the Engineer. In order to expedite the revision process, the request for <br />revision or discussions on the possibility of a revision may be made verbally, but must be <br />followed up by a written request. The verified mix design will remain in effect until the <br />Engineer authorizes a change. In no case will the effective date of the revision be <br />established earlier than the date of the first communication between the Contractor and <br />the Engineer regarding the revision. <br />A new design mix will be required if aggregate sources change, or for any <br />substitution of an aggregate product with a different aggregate code, unless approved by <br />the Engineer. <br /> <br />,., <br />. <br /> <br />r"l <br /> <br />. <br /> <br />..... <br /> <br />. <br /> <br />334-4 Contractor Process Control. <br />Assume full responsibility for controlling all operations and processes such that the <br />requirements of these Specifications are met at all times. Perform any tests necessary at <br />the plant and roadway for process control purposes. The Engineer will not use these test <br />results in the acceptance payment decision. <br />Address in the Quality Control Plan how Process Control failures will be handled. <br />Investigate, at a minimum, the production process, testing equipment and/or sampling <br />methods to determine the cause of the failure, and make any necessary changes to assure <br />compliance with these Specifications. Obtain a follow up sample immediately after <br />corrective actions are taken to assess the adequacy of the corrections. In the event the <br />follow-up Process Control sample also fails to meet Specification requirements, cease <br />production of the asphalt mixture until the problem is adequately resolved to the <br />satisfaction of the Engineer. <br /> <br />,.., <br />. <br /> <br />., <br />. <br /> <br />, <br />. <br /> <br />,., <br /> <br />. <br /> <br />,.., <br /> <br />334-5 Acceptance of the Mixture. <br />334-5.1 General: The mixture will be accepted at the plant with respect to <br />gradation (P-8 and P.200), asphalt content (Pb), and volumetrics (volumetrics is defined as air <br /> <br />. <br /> <br />..... <br /> <br />. <br /> <br />.., <br /> <br />09/09 <br /> <br />01000-58 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.