My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,.., <br /> <br />. <br /> <br />..., <br />. individual Quality Control test results by the Engineer based on the between-laboratory <br />precision values given in Table 334-5 for Gmb. <br />roo, If each of the core test results compare favorably, then the LOT will <br />. be accepted with respect to density, with payment based on the Contractor's Quality <br />Control test data for the LOT. <br />..., If any of the results do not compare favorably, then the core samples <br />. from the LOT will be sent to the Resolution laboratory for testing as specified in 334-5.6. <br />334-5.6 Resolution System: <br />...., 334-5.6.1 Plant Samples: In the event of an unfavorable comparison <br />. between the Contractor's Quality Control test results and the Engineer's Verification test <br />results on any of the properties identified in Table 334-5, the Resolution laboratory will test <br />" all of the split samples from the LOT for only the property (or properties) in question. <br />. Resolution samples shall be reheated at the target roadway compaction temperature for <br />1 1/2 hours, reduced to the appropriate testing size, and conditioned and tested as <br />., described in 334-5.1.1. <br />. 334-5.6.2 Roadway Samples: In the event of an unfavorable comparison <br />between the Contractor's Quality Control test data and the Engineer's Verification test <br />q data on the density results, the Resolution laboratory will test all of the cores from the <br />. LOT. Testing will be as described in 334-5.1.1. Any damaged roadway cores will not be <br />included in the evaluation; replace damaged cores with additional cores at the direction of <br />,.., the Engineer. <br />. 334-5.6.3 Resolution Determination: If the Resolution laboratory results <br />compare favorably (for the property or properties in question) with all of the Quality <br />,., Control results, then acceptance and payment for the LOT will be based on the Quality <br />. Control results; and the Department will bear the costs associated with Resolution testing. <br />No additional compensation, either monetary or time, will be made for the impacts of any <br />,.., such testing. <br />. If the Resolution laboratory results do not compare favorably (for the <br />property or properties in question) with all of the Quality Control results, then acceptance <br />.., and payment for the LOT will be based on the Resolution test data for the LOT, and the <br />. costs of the Resolution testing will be deducted from monthly estimates. No additional time <br />will be granted for the impacts of any such testing. <br />..., In the event of an unfavorable comparison between the Resolution <br />. test results and Quality Control test results, make the necessary adjustments to assure <br />that future comparisons are favorable. <br />..., 334-5.7 Independent Verification Testing: <br />. 334-5.7.1 Plant: Take samples as directed by the Engineer for Independent <br />Verification testing. The Contractor can retain split samples of these samples at their <br />., option. Independent Verification samples will be reheated at the target roadway <br />. compaction temperature for 1 1/2 hours, reduced to the appropriate testing size, and <br />conditioned and tested as described in 334-5.1.1. If any of the results do not meet the <br />.., requirements of Table 334-4, cease production of the asphalt mixture until the problem is <br />. adequately resolved (to the satisfaction of the Engineer), unless it can be demonstrated to <br />the satisfaction of the Engineer that the problem can immediately be (or already has been) <br />.., resolved. Address any material represented by the failing test results in accordance with <br />. 334-5.9.5. <br />334-5.7.2 Roadway: Obtain five roadway cores as directed by the Engineer <br />1""1 for Independent Verification testing. These independent cores will be obtained from the <br /> <br />. <br /> <br />r'1 <br />. <br /> <br />09/09 <br /> <br />01000-64 <br /> <br />03-4122.F <br />
The URL can be used to link to this page
Your browser does not support the video tag.